Risk-benefit comparative analysis of different control methods for reservoirs under the water to electricity mode

Abstract For some small hydropower stations that are not under the control of power dispatching department, there are many ways to implement the reservoir operation scheme formulated under the premise of determining power by water. This paper respectively selects the output, flow and water level process as the control conditions, explores the risks and benefits of reservoir operation with different control variables, and selects the optimal operation scheme through comprehensive comparative analysis. Simulation results of a hydropower station in the Han River Basin show that when the output is taken as the control condition, the waste water is small, the power generation benefit is high, and the risk of the water level outside boundary is within the acceptable range. Considering the risk and benefit of reservoir operation and taking output as the control condition, it has significant advantages over water level and flow.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2024-09-01
DOI
https://doi.org/10.1088/1742-6596/2836/1/012023
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk-benefit comparative analysis of different control methods for reservoirs under the water to electricity mode

Xiaoran Yan, Mengyu Liang, Hongjie Yu
Journal of Physics Conference Series
Reservoir Engineering and Simulation Methods
article

Risk-benefit comparative analysis of different control methods for reservoirs under the water to electricity mode

Xiaoran Yan, Mengyu Liang, Hongjie Yu
article en

Abstract

Abstract For some small hydropower stations that are not under the control of power dispatching department, there are many ways to implement the reservoir operation scheme formulated under the premise of determining power by water. This paper respectively selects the output, flow and water level process as the control conditions, explores the risks and benefits of reservoir operation with different control variables, and selects the optimal operation scheme through comprehensive comparative analysis. Simulation results of a hydropower station in the Han River Basin show that when the output is taken as the control condition, the waste water is small, the power generation benefit is high, and the risk of the water level outside boundary is within the acceptable range. Considering the risk and benefit of reservoir operation and taking output as the control condition, it has significant advantages over water level and flow.

Journal of Physics Conference SeriesVol. 2836(1)
HBIS (China) (CN), Zhejiang Water Conservancy and Hydropower Survey and Design Institute (CN), Zhejiang University of Water Resource and Electric Power (CN)
Openalex Percentile: Top 80%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk-benefit comparative analysis of different control methods for reservoirs under the water to electricity mode — Xiaoran Yan, Mengyu Liang, et al. · Journal of Physics Conference Series (2024) | TGRS Research Map | TGRS