Parking Space Demand Study for Dondo Market, Tojo Una-Una District

The current parking space at Dondo Market is not effective because it still uses the road shoulder and is not well organised. When the market is busy, the parking area is full of two- and four-wheeled vehicles, spilling over onto the road, causing congestion and disturbing road users. Therefore, an analysis is needed to determine the ideal parking space requirements. The purpose of this study is to provide recommendations for parking space requirements and design its layout, as well as analyse traffic performance on Jl. Tj. Keramat before and after the parking facility. The results show that the market manager should provide potential land for off street parking. There is vacant land to the right and left of the market with a total area of 6,985 m2 which exceeds the current parking demand. If needed, there is still vacant land owned by the community around the market that can be developed as an additional parking area.

Authors

Publication Details

Journal
International Journal of Innovative Science and Research Technology (IJISRT)
Published
2024-09-17
DOI
https://doi.org/10.38124/ijisrt/ijisrt24aug1538
Citations
2
Primary Topic
Smart Parking Systems Research
Type
article
Field-Weighted Citation Impact
0.53
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Parking Space Demand Study for Dondo Market, Tojo Una-Una District

Ratnasari Ramlan, Arief Setiawan, Mohammad Ruslan Mardani
2 citations
International Journal of Innovative Science and Research Technology (IJISRT)
Smart Parking Systems Research
0.53
article

Parking Space Demand Study for Dondo Market, Tojo Una-Una District

Ratnasari Ramlan, Arief Setiawan, Mohammad Ruslan Mardani
article en
2 citations

Abstract

The current parking space at Dondo Market is not effective because it still uses the road shoulder and is not well organised. When the market is busy, the parking area is full of two- and four-wheeled vehicles, spilling over onto the road, causing congestion and disturbing road users. Therefore, an analysis is needed to determine the ideal parking space requirements. The purpose of this study is to provide recommendations for parking space requirements and design its layout, as well as analyse traffic performance on Jl. Tj. Keramat before and after the parking facility. The results show that the market manager should provide potential land for off street parking. There is vacant land to the right and left of the market with a total area of 6,985 m2 which exceeds the current parking demand. If needed, there is still vacant land owned by the community around the market that can be developed as an additional parking area.

International Journal of Innovative Science and Research Technology (IJISRT)
Openalex Percentile: Top 34%
Smart Parking Systems Research
0.53
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.