Budget allocation problem for projects with considering risks, robustness, resiliency, and sustainability requirements

Budget Allocation Problem (BAP) for projects is considered one of the critical risks that necessitate the completion of projects in the shortest possible duration. This aspect is significant in extensive projects such as national endeavors directly impacting people's livelihoods. This research focuses on introducing Sustainable, Robust, Resilient, and Risk-averse Budget Allocation for Projects (S3RBAP). A hybrid robust stochastic optimization approach was employed, incorporating Weighted VaR (WVaR) and the minimum function as risk criteria to ensure the robustness of the objective function. This model is designed to minimize the weighted expected value, WVaR, and the minimum progress function, thereby promoting the 3R and sustainability framework to tackle budget fluctuations and enhance project viability. The case study revolves around the construction of national projects in Iran. Ultimately, the project's required budget was allocated within the budgetary constraints. Sensitivity analysis found that the integration of 3R and sustainability led to a 13.5 % reduction in the progress function compared to scenarios without these principles. Furthermore, increasing the conservatism coefficient to 20 % decreased the progress function to −0.58 %. Reducing the resiliency coefficient had an adverse effect by disrupting the budget allocation process. The computational time is increased gradually with the escalation of problem complexity, while the progress function decreases due to the increased number of projects. The findings demonstrate that using an exponential function promotes risk aversion, whereas a sine function encourages risk-seeking behaviour within this research context. • A novel Budget Allocation Problem (BAP) for projects is presented. • Risks, robustness, resiliency, and sustainability are considered. • A new robust stochastic optimization with Weighted VaR is proposed. • The project's remaining progress function (S-curve function) is surveyed. • Sensitivity analyses are used to evaluate the performance of proposed model.

Authors

Institutions

Publication Details

Journal
Results in Engineering
Published
2024-09-17
DOI
https://doi.org/10.1016/j.rineng.2024.102828
Citations
11
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
5.93
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Budget allocation problem for projects with considering risks, robustness, resiliency, and sustainability requirements

Mansour Bazregar, Reza Lotfi, Masoud Vaseei, Sadia Samar Ali et al.
11 citations
Results in Engineering
Capital Investment and Risk Analysis
5.93
article

Budget allocation problem for projects with considering risks, robustness, resiliency, and sustainability requirements

Mansour Bazregar, Reza Lotfi, Masoud Vaseei, Sadia Samar Ali, Sayyed Mohammad Reza Davoodi, Soheila Sadeghi
article en
11 citations

Abstract

Budget Allocation Problem (BAP) for projects is considered one of the critical risks that necessitate the completion of projects in the shortest possible duration. This aspect is significant in extensive projects such as national endeavors directly impacting people's livelihoods. This research focuses on introducing Sustainable, Robust, Resilient, and Risk-averse Budget Allocation for Projects (S3RBAP). A hybrid robust stochastic optimization approach was employed, incorporating Weighted VaR (WVaR) and the minimum function as risk criteria to ensure the robustness of the objective function. This model is designed to minimize the weighted expected value, WVaR, and the minimum progress function, thereby promoting the 3R and sustainability framework to tackle budget fluctuations and enhance project viability. The case study revolves around the construction of national projects in Iran. Ultimately, the project's required budget was allocated within the budgetary constraints. Sensitivity analysis found that the integration of 3R and sustainability led to a 13.5 % reduction in the progress function compared to scenarios without these principles. Furthermore, increasing the conservatism coefficient to 20 % decreased the progress function to −0.58 %. Reducing the resiliency coefficient had an adverse effect by disrupting the budget allocation process. The computational time is increased gradually with the escalation of problem complexity, while the progress function decreases due to the increased number of projects. The findings demonstrate that using an exponential function promotes risk aversion, whereas a sine function encourages risk-seeking behaviour within this research context. • A novel Budget Allocation Problem (BAP) for projects is presented. • Risks, robustness, resiliency, and sustainability are considered. • A new robust stochastic optimization with Weighted VaR is proposed. • The project's remaining progress function (S-curve function) is surveyed. • Sensitivity analyses are used to evaluate the performance of proposed model.

Results in EngineeringVol. 24
Yazd University (IR), Islamic Azad University South Tehran Branch (IR), International Management Institute (IN), King Abdulaziz University (SA), Islamic Azad University, Lahijan Branch (IR), Islamic Azad University Dehaghan (IR), University of the Incarnate Word (US)
Openalex Percentile: Top 3%
Capital Investment and Risk Analysis
5.93
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.