Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm

Purpose This paper aims to create a comprehensive framework for selecting alternative materials in construction projects, integrating building information modeling (BIM) and the particle swarm optimization (PSO) algorithm. Materials comprise 60%–65% of the total project cost, and current methods require significant time and human resources. Design/methodology/approach A prototype framework is developed that considers multiple criteria to optimize the material selection process, addressing the significant investment of time and resources required in current methods. The study uses surveys and interviews with construction professionals to collect primary data on alternative materials selection. Findings The results show that integrating BIM and the PSO algorithm improves cost optimization and material selection outcomes. Originality/value This comprehensive tool enhances decision-making capabilities and resource utilization, improving project outcomes and resource utilization. It offers a systematic approach to evaluating and selecting materials, making it a valuable resource for construction professionals.

Authors

Institutions

Publication Details

Journal
Construction Innovation
Published
2024-09-14
DOI
https://doi.org/10.1108/ci-12-2023-0309
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm

Martin Skitmore, Majid Alipour, Milad Ghanbari, Mahdi Ebrahimi Salari
1 citations
Construction Innovation
BIM and Construction Integration
0.27
article

Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm

Martin Skitmore, Majid Alipour, Milad Ghanbari, Mahdi Ebrahimi Salari
article en
1 citations

Abstract

Purpose This paper aims to create a comprehensive framework for selecting alternative materials in construction projects, integrating building information modeling (BIM) and the particle swarm optimization (PSO) algorithm. Materials comprise 60%–65% of the total project cost, and current methods require significant time and human resources. Design/methodology/approach A prototype framework is developed that considers multiple criteria to optimize the material selection process, addressing the significant investment of time and resources required in current methods. The study uses surveys and interviews with construction professionals to collect primary data on alternative materials selection. Findings The results show that integrating BIM and the PSO algorithm improves cost optimization and material selection outcomes. Originality/value This comprehensive tool enhances decision-making capabilities and resource utilization, improving project outcomes and resource utilization. It offers a systematic approach to evaluating and selecting materials, making it a valuable resource for construction professionals.

Construction InnovationVol. 26(3)
Islamic Azad University, Tehran (IR), Bond University (AU), Islamic Azad University South Tehran Branch (IR), Queensland University of Technology (AU), Islamic Azad University North Tehran Branch (IR), Sadjad University of Technology (IR)
Openalex Percentile: Top 44%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm — Martin Skitmore, Majid Alipour, et al. · Construction Innovation (2024) | TGRS Research Map | TGRS