A new composite heuristic to minimize the total tardiness for the single machine scheduling problem with variable and flexible maintenance
• We address single machine scheduling problem with flexible/variable maintenance. • We introduce three new MILP models. • We present a novel heuristic algorithm configured into three distinct variants. • We compare several heuristic algorithms. Inspired by a real-world maintenance/job scheduling issue coming from the semiconductor industry, the present paper proposes a new heuristic algorithm structure for the single machine scheduling T-problem with flexible and variable maintenance, job release dates and sequence dependence setup times. Considering the typical short-term production planning needs, a single maintenance problem has to be scheduled within a certain time interval, along with a set of jobs so as to minimize the total tardiness. A twofold contribution emerges from the present paper. First, four mixed-integer linear programming models are developed for the problem at hand and compared in terms of time to convergence and computational complexity. Second, a novel heuristic algorithm, which has been configured into three distinct variants, has been compared with 17 alternative heuristics from the relevant literature based on a comprehensive experimental campaign. The numerical results allow the selection of the most suitable MILP model and confirm the effectiveness of the proposed heuristic approach.
Authors
- António Costa (ORCID: https://orcid.org/0000-0001-9284-0098)
- Roberto Rosario Corsini (ORCID: https://orcid.org/0000-0003-3169-2487)
- Daniele Pagano (ORCID: https://orcid.org/0000-0003-4070-454X)
- Victor Fernández-Viagas
Institutions
- STMicroelectronics (Switzerland) (CH)
- University of Catania (IT)
- Universidad de Sevilla (ES)
Publication Details
- Journal
- Computers & Operations Research
- Published
- 2024-09-14
- DOI
- https://doi.org/10.1016/j.cor.2024.106849
- Citations
- 4
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 1.40
Funders
- Key Digital Technologies Joint Undertaking