“Modernization of Railway Track Pardubice –Stéblová: New steel bridge over Labe river”
Abstract The construction of a new double‐track steel railway arch bridge over the Elbe river, which replaced the original single‐track bridge from 1966, has significantly increased the capacity, speed, and smoothness of railway traffic in Pardubice. This 140‐meter‐long, three‐span bridge was realized as part of the modernization and double‐tracking of the Pardubice ‐ Hradec Králové line between 2021‐2024. Its construction, coupled with the provisional use of the original bridge, represents a remarkable engineering feat
Authors
- Jan Mitlöhner
Publication Details
- Journal
- ce/papers
- Published
- 2024-09-01
- DOI
- https://doi.org/10.1002/cepa.3060
- Primary Topic
- Structural Engineering and Materials Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00