Analisa Rekayasa Nilai (Value Engineering) pada Struktur Bangunan SDN Karangketug 3 Kota Pasuruan

The construction project of SDN Karangketug 3 in Pasuruan City includes several high-cost components that could still be optimized through efficiency improvements. In the structural work, the researcher attempted to modify the structural design by exploring alternative design options without compromising the quality or strength of the structure, using Value Engineering techniques. The research process involved several stages: Observation, Design and Cost Identification, Structural Analysis, Cost Estimation, and Analysis Results. Cost savings were achieved by reducing the dimensions of the beam and column cross-sections, while ensuring structural strength was maintained using the SAP2000 software program, and recalculating the optimal budget. SAP2000 analysis showed that all alternative frames passed the stress/capacity check. The optimal budget after value engineering for the beam and column structure amounted to a 34.23% reduction, from the initial cost of Rp. 116,284,340.70 to Rp. 76,481,631.65, representing a saving of Rp. 39,802,709.05.

Authors

Institutions

Publication Details

Journal
AKADEMIK Jurnal Mahasiswa Humanis
Published
2024-09-01
DOI
https://doi.org/10.37481/jmh.v4i3.1037
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisa Rekayasa Nilai (Value Engineering) pada Struktur Bangunan SDN Karangketug 3 Kota Pasuruan

Khoirul Anwar, Januar Sasongko
AKADEMIK Jurnal Mahasiswa Humanis
Geotechnical and construction materials studies
article

Analisa Rekayasa Nilai (Value Engineering) pada Struktur Bangunan SDN Karangketug 3 Kota Pasuruan

Khoirul Anwar, Januar Sasongko
article en

Abstract

The construction project of SDN Karangketug 3 in Pasuruan City includes several high-cost components that could still be optimized through efficiency improvements. In the structural work, the researcher attempted to modify the structural design by exploring alternative design options without compromising the quality or strength of the structure, using Value Engineering techniques. The research process involved several stages: Observation, Design and Cost Identification, Structural Analysis, Cost Estimation, and Analysis Results. Cost savings were achieved by reducing the dimensions of the beam and column cross-sections, while ensuring structural strength was maintained using the SAP2000 software program, and recalculating the optimal budget. SAP2000 analysis showed that all alternative frames passed the stress/capacity check. The optimal budget after value engineering for the beam and column structure amounted to a 34.23% reduction, from the initial cost of Rp. 116,284,340.70 to Rp. 76,481,631.65, representing a saving of Rp. 39,802,709.05.

AKADEMIK Jurnal Mahasiswa HumanisVol. 4(3)
Universitas Yudharta Pasuruan (ID)
Openalex Percentile: Top 83%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisa Rekayasa Nilai (Value Engineering) pada Struktur Bangunan SDN Karangketug 3 Kota Pasuruan — Khoirul Anwar, Januar Sasongko · AKADEMIK Jurnal Mahasiswa Humanis (2024) | TGRS Research Map | TGRS