INCREASING THE CAPACITY OF UKRAINE'S TRANSMISSION NETWORKS

In connection with the projected significant increase in electricity demand by 2030, as well as for the purpose of devel-oping the electricity system and effective interaction of the IPS of Ukraine with the energy systems of the European Un-ion, the article considers the need and feasibility of converting the Ukrainian power grids from 330 kV to 400 kV, com-paring the technical characteristics of grids of different voltage classes in terms of reliability, stability and efficiency of such grids. The paper provides an applied analysis of the efficiency of switching 330 kV rated voltage networks to 400 kV voltage class by the criterion of increasing the capacity of electrical equipment and reducing total power losses in the network. On the example of the Dnipro region of the IPS of Ukraine, the complex of computer programs designed for the design of power grids of power systems " Thesaurus" was used to model and analyze the modes of operation of the power grid at 330 kV and 400 kV. As a result, it was found that an increase in the voltage level will lead to a de-crease in the load of certain line sections by 17 %, while the value of total network losses will decrease by 10.8 %. Ref. 4, fig. 3.

Authors

Publication Details

Journal
Praci Institutu elektrodinamiki Nacionalanoi akademii nauk Ukraini
Published
2024-08-30
DOI
https://doi.org/10.15407/publishing2024.68.071
Primary Topic
Environmental and Industrial Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

INCREASING THE CAPACITY OF UKRAINE'S TRANSMISSION NETWORKS

D. Kravchenko, Oksana Bohomolova
Praci Institutu elektrodinamiki Nacionalanoi akademii nauk Ukraini
Environmental and Industrial Safety
article

INCREASING THE CAPACITY OF UKRAINE'S TRANSMISSION NETWORKS

D. Kravchenko, Oksana Bohomolova
article en

Abstract

In connection with the projected significant increase in electricity demand by 2030, as well as for the purpose of devel-oping the electricity system and effective interaction of the IPS of Ukraine with the energy systems of the European Un-ion, the article considers the need and feasibility of converting the Ukrainian power grids from 330 kV to 400 kV, com-paring the technical characteristics of grids of different voltage classes in terms of reliability, stability and efficiency of such grids. The paper provides an applied analysis of the efficiency of switching 330 kV rated voltage networks to 400 kV voltage class by the criterion of increasing the capacity of electrical equipment and reducing total power losses in the network. On the example of the Dnipro region of the IPS of Ukraine, the complex of computer programs designed for the design of power grids of power systems " Thesaurus" was used to model and analyze the modes of operation of the power grid at 330 kV and 400 kV. As a result, it was found that an increase in the voltage level will lead to a de-crease in the load of certain line sections by 17 %, while the value of total network losses will decrease by 10.8 %. Ref. 4, fig. 3.

Praci Institutu elektrodinamiki Nacionalanoi akademii nauk UkrainiVol. 2024(68)
Affordable and clean energy
Openalex Percentile: Top 86%
Environmental and Industrial Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

INCREASING THE CAPACITY OF UKRAINE'S TRANSMISSION NETWORKS — D. Kravchenko, Oksana Bohomolova · Praci Institutu elektrodinamiki Nacionalanoi akademii nauk Ukraini (2024) | TGRS Research Map | TGRS