A Perception Survey of Lean Management Practices for Safer Off-Site Construction

Lean practice is recognised for having a great potential in promoting safety risk management in off-site construction (OSC). This paper presents results of a study conducted to assess the impact of lean practice on safety risk management in OSC in a developing country. A quantitative approach using a survey-based questionnaire was adopted. Lean management practices (LMPs) identified from a literature review were empirically tested using a sample survey of 103 OSC contractors. The survey responses were subjected to descriptive and inferential statistics. The top ranked LMPs for safety risk management in OSC included two mistake-proofing practices, i.e., use of personal protective equipment (PPE) and use of hazard warning equipment; two last planner system (LPS) practices, i.e., involvement of workers in safety planning and providing necessary working equipment; and one first run studies (FRS) practice, i.e., critical analysis of work methods. These LMPs are useful in controlling high-consequence safety risks in OSC. Based on evidence found in this study, the paper argues that lean practice can bring great value to safety risk management in OSC in countries where OSC is transitioning.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-09-10
DOI
https://doi.org/10.3390/buildings14092860
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Perception Survey of Lean Management Practices for Safer Off-Site Construction

Wakisa Simukonda, Fidelis Emuze
1 citations
Buildings
Construction Project Management and Performance
0.49
article

A Perception Survey of Lean Management Practices for Safer Off-Site Construction

Wakisa Simukonda, Fidelis Emuze
article en
1 citations

Abstract

Lean practice is recognised for having a great potential in promoting safety risk management in off-site construction (OSC). This paper presents results of a study conducted to assess the impact of lean practice on safety risk management in OSC in a developing country. A quantitative approach using a survey-based questionnaire was adopted. Lean management practices (LMPs) identified from a literature review were empirically tested using a sample survey of 103 OSC contractors. The survey responses were subjected to descriptive and inferential statistics. The top ranked LMPs for safety risk management in OSC included two mistake-proofing practices, i.e., use of personal protective equipment (PPE) and use of hazard warning equipment; two last planner system (LPS) practices, i.e., involvement of workers in safety planning and providing necessary working equipment; and one first run studies (FRS) practice, i.e., critical analysis of work methods. These LMPs are useful in controlling high-consequence safety risks in OSC. Based on evidence found in this study, the paper argues that lean practice can bring great value to safety risk management in OSC in countries where OSC is transitioning.

BuildingsVol. 14(9)
Central University of Technology (ZA), Nelson Mandela University (ZA)
Openalex Percentile: Top 31%
Construction Project Management and Performance
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.