Profit Comparison of Computer System with Hardware Redundancy Subject to Different Repair Activities

In this research paper, main concentrate of the authors on the profit comparison of computer system with hardware redundancy by introducing the concept of priority to software up-gradation, hardware preventive maintenance (PM) and hardware maximum repair time (MRT). The system fails independently from normal mode. All the repair activities such as hardware repair, software up-gradation, hardware preventive maintenance before failure and hardware replacement after maximum repair time are carried out by a single server immediately on need basis. All random variables are statistically independent. The negative exponential distribution is taken for the failure time of the component while the distributions of repair time, up-gradation time, preventive maintenance and replacement time are assumed arbitrary with different probability density functions. Semi-Markov process and regenerative point technique are used. The behaviour of profits of the system models have been examined for different parameters and costs.

Authors

Institutions

Publication Details

Journal
International Journal Of Engineering And Computer Science
Published
2024-08-15
DOI
https://doi.org/10.18535/ijecs/v13i08.4872
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Profit Comparison of Computer System with Hardware Redundancy Subject to Different Repair Activities

Permila, V.J. Munday
International Journal Of Engineering And Computer Science
Manufacturing Process and Optimization
article

Profit Comparison of Computer System with Hardware Redundancy Subject to Different Repair Activities

Permila, V.J. Munday
article en

Abstract

In this research paper, main concentrate of the authors on the profit comparison of computer system with hardware redundancy by introducing the concept of priority to software up-gradation, hardware preventive maintenance (PM) and hardware maximum repair time (MRT). The system fails independently from normal mode. All the repair activities such as hardware repair, software up-gradation, hardware preventive maintenance before failure and hardware replacement after maximum repair time are carried out by a single server immediately on need basis. All random variables are statistically independent. The negative exponential distribution is taken for the failure time of the component while the distributions of repair time, up-gradation time, preventive maintenance and replacement time are assumed arbitrary with different probability density functions. Semi-Markov process and regenerative point technique are used. The behaviour of profits of the system models have been examined for different parameters and costs.

International Journal Of Engineering And Computer ScienceVol. 13(08)
University of Delhi (IN), University College for Women (IN)
Openalex Percentile: Top 79%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Profit Comparison of Computer System with Hardware Redundancy Subject to Different Repair Activities — Permila, V.J. Munday · International Journal Of Engineering And Computer Science (2024) | TGRS Research Map | TGRS