Cost-based performance optimization of a single system under a hierarchical imperfect maintenance policy

Abstract Accepted by: M. Zied Babai Due to the influence of external factors such as repair sites and seasonal climate change, it is difficult to restore the performance of a system to any intermediate level between perfect and minimal maintenance through imperfect maintenance. This article first categorizes the states of the system just before repair into three classes based on its internal degradation level: failure, major defect and minor defect, with three corresponding thresholds. Subsequently, the corresponding repairs are carried out to dwindle the system’s degradation to different levels. In detail, if the internal degradation level of the system just before repair is recognized as minor defect, an imperfect repair, termed as type I imperfect repair, is implemented to scale down the degradation level below the minor defect threshold. If the degradation level is identified as major defect, an upgraded imperfect repair, termed as type II imperfect repair, is executed to only lower the degradation to the level between the minor defect threshold and major defect threshold. Otherwise, if the degradation before repair is beyond the failure threshold, replacement will be carried out instead of these imperfect repairs. Thus, a novel hierarchical imperfect maintenance structure is introduced. Then, a multi-variable repair cost model is constructed when considering the related costs incurred from inspection, type I imperfect repair, type II imperfect repair, replacement and even system downtime. Finally, with the aid of the stationary law of Markov chains and the semi-regenerative process, the cost-based performance optimization with three parameters, including the inspection interval, minor defect threshold and major defect threshold, is explored through a numerical experiment, and the closed-form expression of the optimal cost rate is provided.

Authors

Institutions

Publication Details

Journal
IMA Journal of Management Mathematics
Published
2024-09-05
DOI
https://doi.org/10.1093/imaman/dpae020
Citations
1
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.36
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost-based performance optimization of a single system under a hierarchical imperfect maintenance policy

Xiaojun Liang, Lirong Cui, Ruiting Wang, Weixin Jiang
1 citations
IMA Journal of Management Mathematics
Reliability and Maintenance Optimization
0.36
article

Cost-based performance optimization of a single system under a hierarchical imperfect maintenance policy

Xiaojun Liang, Lirong Cui, Ruiting Wang, Weixin Jiang
article en
1 citations

Abstract

Abstract Accepted by: M. Zied Babai Due to the influence of external factors such as repair sites and seasonal climate change, it is difficult to restore the performance of a system to any intermediate level between perfect and minimal maintenance through imperfect maintenance. This article first categorizes the states of the system just before repair into three classes based on its internal degradation level: failure, major defect and minor defect, with three corresponding thresholds. Subsequently, the corresponding repairs are carried out to dwindle the system’s degradation to different levels. In detail, if the internal degradation level of the system just before repair is recognized as minor defect, an imperfect repair, termed as type I imperfect repair, is implemented to scale down the degradation level below the minor defect threshold. If the degradation level is identified as major defect, an upgraded imperfect repair, termed as type II imperfect repair, is executed to only lower the degradation to the level between the minor defect threshold and major defect threshold. Otherwise, if the degradation before repair is beyond the failure threshold, replacement will be carried out instead of these imperfect repairs. Thus, a novel hierarchical imperfect maintenance structure is introduced. Then, a multi-variable repair cost model is constructed when considering the related costs incurred from inspection, type I imperfect repair, type II imperfect repair, replacement and even system downtime. Finally, with the aid of the stationary law of Markov chains and the semi-regenerative process, the cost-based performance optimization with three parameters, including the inspection interval, minor defect threshold and major defect threshold, is explored through a numerical experiment, and the closed-form expression of the optimal cost rate is provided.

IMA Journal of Management MathematicsVol. 36(3)
Qingdao University (CN), Qingdao Agricultural University (CN), Inner Mongolia University of Finance and Economics (CN), Hulunbuir University (CN)
Openalex Percentile: Top 40%
Reliability and Maintenance Optimization
0.36
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.