Wastag and Its Elimination in Software Development Projects in Europe in the Context of Lean IT

The article introduces the concept of wastage and its elimination in software development projects in the context of Lean IT. Empirical research in 142 European computer programming companies shows the types of losses and their causes, as well as the techniques used to minimise them. The main losses are delays and waiting, unnecessary meetings and switching between tasks. The most common causes of losses are overly ambitious client requirements and running multiple projects at the same time. Techniques used to reduce wastage include agile project management and proper planning. Larger organisations tend to have higher levels of wastage. Statistical analysis has shown that delays are associated with unnecessary processes and movements. Poor communication in particular causes various types of wastage, while software defects in particular have multiple causes. Logistic regressions showed that the elimination of wastage correlates with a better competitive position and development prospects of companies.

Authors

Institutions

Publication Details

Journal
Proceedings of the International Conference on Information Systems Development
Published
2024-09-09
DOI
https://doi.org/10.62036/isd.2024.123
Citations
1
Primary Topic
Software Engineering Techniques and Practices
Type
article
Field-Weighted Citation Impact
0.78
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Wastag and Its Elimination in Software Development Projects in Europe in the Context of Lean IT

Elżbieta Wojnicka‐Sycz, Piotr Sycz
1 citations
Proceedings of the International Conference on Information Systems Development
Software Engineering Techniques and Practices
0.78
article

Wastag and Its Elimination in Software Development Projects in Europe in the Context of Lean IT

Elżbieta Wojnicka‐Sycz, Piotr Sycz
article en
1 citations

Abstract

The article introduces the concept of wastage and its elimination in software development projects in the context of Lean IT. Empirical research in 142 European computer programming companies shows the types of losses and their causes, as well as the techniques used to minimise them. The main losses are delays and waiting, unnecessary meetings and switching between tasks. The most common causes of losses are overly ambitious client requirements and running multiple projects at the same time. Techniques used to reduce wastage include agile project management and proper planning. Larger organisations tend to have higher levels of wastage. Statistical analysis has shown that delays are associated with unnecessary processes and movements. Poor communication in particular causes various types of wastage, while software defects in particular have multiple causes. Logistic regressions showed that the elimination of wastage correlates with a better competitive position and development prospects of companies.

Proceedings of the International Conference on Information Systems Development
University of Gdańsk (PL)
Industry, innovation and infrastructure
Openalex Percentile: Top 21%
Software Engineering Techniques and Practices
0.78
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Wastag and Its Elimination in Software Development Projects in Europe in the Context of Lean IT — Elżbieta Wojnicka‐Sycz, Piotr Sycz · Proceedings of the International Conference on Information Systems Development (2024) | TGRS Research Map | TGRS