Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model

Prefabricated construction is being developed as one of the pathways toward circularity in the construction industry. However, compared to traditional cast-in-place construction methods, the design of prefabricated construction site layouts presents unique challenges, such as managing the space for prefabricated components and lifting equipment, and coordinating the precise timing between off-site fabrication and on-site assembly. Existing research has primarily focused on traditional cast-in-place construction, leaving room for improvement in optimisation models for prefabricated site layouts. This study develops a BIM-based System Layout Planning-Genetic Algorithm (SLP-GA) model specifically tailored for prefabricated construction site optimisation. The proposed model improves the accuracy and visualisation of layout planning through BIM technology, enabling dynamic adjustments and real-time data integration. It also incorporates genetic algorithms to address complex multi-objective optimisation problems, avoiding local optima and overcoming the limitations of traditional SLP methods that rely on subjective judgements. Unlike previous studies that do not consider secondary handling, the optimisation objectives of this study focus on minimising material handling costs associated with secondary handling and maximising comprehensive relationships, including efficiency, safety and space utilisation. The application of this model in a case study shows a reduction in logistics costs of 8.58% and an improvement in comprehensive relationships of 11.61%, indicating significant improvements. This research advances optimisation methods for prefabricated construction site layouts, enriches optimisation objectives by considering secondary handling, and provides practical guidance for improving the efficiency and effectiveness of prefabricated construction projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-09-09
DOI
https://doi.org/10.3390/buildings14092841
Citations
5
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.33

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model

Liang Wang, Qi Wang, Lin Wang, Shuxiu Dong et al.
5 citations
Buildings
BIM and Construction Integration
1.33
article

Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model

Liang Wang, Qi Wang, Lin Wang, Shuxiu Dong, Yue Cao
article en
5 citations

Abstract

Prefabricated construction is being developed as one of the pathways toward circularity in the construction industry. However, compared to traditional cast-in-place construction methods, the design of prefabricated construction site layouts presents unique challenges, such as managing the space for prefabricated components and lifting equipment, and coordinating the precise timing between off-site fabrication and on-site assembly. Existing research has primarily focused on traditional cast-in-place construction, leaving room for improvement in optimisation models for prefabricated site layouts. This study develops a BIM-based System Layout Planning-Genetic Algorithm (SLP-GA) model specifically tailored for prefabricated construction site optimisation. The proposed model improves the accuracy and visualisation of layout planning through BIM technology, enabling dynamic adjustments and real-time data integration. It also incorporates genetic algorithms to address complex multi-objective optimisation problems, avoiding local optima and overcoming the limitations of traditional SLP methods that rely on subjective judgements. Unlike previous studies that do not consider secondary handling, the optimisation objectives of this study focus on minimising material handling costs associated with secondary handling and maximising comprehensive relationships, including efficiency, safety and space utilisation. The application of this model in a case study shows a reduction in logistics costs of 8.58% and an improvement in comprehensive relationships of 11.61%, indicating significant improvements. This research advances optimisation methods for prefabricated construction site layouts, enriches optimisation objectives by considering secondary handling, and provides practical guidance for improving the efficiency and effectiveness of prefabricated construction projects.

BuildingsVol. 14(9)
Beihua University (CN), Hainan University (CN), Dalian University of Technology (CN)
People's Government of Jilin Province
Industry, innovation and infrastructure
Openalex Percentile: Top 21%
BIM and Construction Integration
1.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.