PENITIPAN GANTI RUGI DALAM PENGADAAN TANAH JALAN TOL SERPONG-BALARAJA (STUDI PUTUSAN NOMOR 422/PDT.BTH/2021/PN TNG)

The construction of the Serpong-Balaraja toll road faced issues with the amount of compensation not matching the determined results, leading to Custody of Compensation in the District Court. This article addresses two main problems: (1) Whether the Custody of Indemnity Procedure by the Ministry of Public Works and Public Housing (PUPR) and the Director aligns with the law, and (2) How the judge ruled in the Maryati case regarding the Custody of Indemnity by the Ministry of PUPR. This descriptive normative research uses literature studies for data collection, analyzed qualitatively, with conclusions drawn using the deductive method. It was found that the Ministry of PUPR and the Director General of Bina followed the consignment process correctly according to the laws, yet under Presidential Regulation Number 71 of 2012, if the eligible party rejects the compensation amount set by a final court decision, the consignment process fails to reach an agreement. Thus, the conclusion is that the Indemnity Deposit Procedure by the Ministry of PUPR in acquiring land for the Serpong-Balaraja toll road project did not comply with the applicable laws and regulations.

Authors

Institutions

Publication Details

Journal
Reformasi Hukum Trisakti
Published
2024-08-30
DOI
https://doi.org/10.25105/refor.v6i3.20168
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENITIPAN GANTI RUGI DALAM PENGADAAN TANAH JALAN TOL SERPONG-BALARAJA (STUDI PUTUSAN NOMOR 422/PDT.BTH/2021/PN TNG)

Fadilla Ramdani, Irene Eka Sihombing
Reformasi Hukum Trisakti
Geotechnical and construction materials studies
article

PENITIPAN GANTI RUGI DALAM PENGADAAN TANAH JALAN TOL SERPONG-BALARAJA (STUDI PUTUSAN NOMOR 422/PDT.BTH/2021/PN TNG)

Fadilla Ramdani, Irene Eka Sihombing
article en

Abstract

The construction of the Serpong-Balaraja toll road faced issues with the amount of compensation not matching the determined results, leading to Custody of Compensation in the District Court. This article addresses two main problems: (1) Whether the Custody of Indemnity Procedure by the Ministry of Public Works and Public Housing (PUPR) and the Director aligns with the law, and (2) How the judge ruled in the Maryati case regarding the Custody of Indemnity by the Ministry of PUPR. This descriptive normative research uses literature studies for data collection, analyzed qualitatively, with conclusions drawn using the deductive method. It was found that the Ministry of PUPR and the Director General of Bina followed the consignment process correctly according to the laws, yet under Presidential Regulation Number 71 of 2012, if the eligible party rejects the compensation amount set by a final court decision, the consignment process fails to reach an agreement. Thus, the conclusion is that the Indemnity Deposit Procedure by the Ministry of PUPR in acquiring land for the Serpong-Balaraja toll road project did not comply with the applicable laws and regulations.

Reformasi Hukum TrisaktiVol. 6(3)
Universitas Trisakti (ID)
Openalex Percentile: Top 83%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.