Feasibility of CO2 pipeline construction to enable gigaton-scale carbon dioxide removals: evidence from historical precedent
<title>Abstract</title> We assess the feasibility of a rapid CO2 pipeline buildout using historical evidence from oil and gas pipelines. We answer four questions: 1) What length of pipeline network will be required to achieve the benchmarks of 1 GT or 100 Mt of CO<sub>2</sub> in 2050? 2) What have been the fastest national oil and gas pipeline buildouts achieved in a 25-year period ? 3) Are the pipeline requirements for gigaton-scale CO<sub>2</sub> removals feasible given these historical precedents, and 4) Under what political, economic, and social circumstances have rapid pipeline buildouts occurred? Modelling studies projecting 100 Mt of CO<sub>2</sub> transportation and sequestration capacity by 2050 suggest rates of pipeline construction that are precedented in 18 national 25 year build-outs during the twentieth and twenty-fist centuries. For 1 Gt, only two 25-year national pipeline build-outs (both in the USA) achieve the rate of pipeline construction that the modelling studies suggest would be required, only three 25-year periods of global pipeline construction meet the benchmark. Rapid construction of fossil fuel pipelines has benefited from strong economic and institutional drivers, which may not apply to CO<sub>2</sub> pipelines in the same way. Our findings are reason for caution about the likelihood of CO<sub>2</sub> pipeline buildouts keeping pace with CO<sub>2</sub> removal targets.
Authors
- Cameron Roberts (ORCID: https://orcid.org/0000-0001-7907-6961)
- Gregory F. Nemet (ORCID: https://orcid.org/0000-0001-7859-4580)
- Jenna Hatcher Greene
Institutions
- University of Wisconsin–Madison (US)
- Wisconsin Disability Association (US)
- Carleton University (CA)
Publication Details
- Journal
- Frontiers in Climate
- Published
- 2026-07-23
- DOI
- https://doi.org/10.3389/fclim.2026.1807933
- Primary Topic
- Carbon Dioxide Capture Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- HORIZON EUROPE European Research Council