Evaluation for The Production Process of The Cover Plate Components Using Time Study Technique: A Case Study

Time study plays a crucial role in optimizing production efficiency and resource utilization in manufacturing processes. Time study helps to counter problems that occurred in the production industry such as uneven task distribution, bottlenecks, idle time, complexity, and time constraints. In this case study, a manufacturing company has been selected as a case study for time study which focused on packing department that produced cover plate component in order to identify the task time, normal time and standard time. There are 12 work elements that were identified in this case study and these work elements were grouped into 5 different workstations based on cycle time. As a result, among of 12 work elements, the first 7 work elements indicates that the processes did not show any delay, where the processes can be done in range of 12% to 31% faster than the expected standard time. Meanwhile the other 5 work elements indicates a delay in task completion, which is up to 43.63 seconds. In case of workstation analysis, workstation 1, 2 and 3 showcasing effective performance in terms of task completion, with 14.6% to 31.1% faster than the standard time. However, for workstation 4 and 5 were recorded a procrastinate process time about 8% and 11%, which can translated as 30.3 secondsand 77.7 seconds, respectively.As a conclusion, the analysis of manufacturing task efficiency identified elements H, I, J, K, and L as needing improvement. Conversely, elements A, B, C, D, E, F, and G are performing well. Workstations 4 and 5 are bottlenecks that hinder overall production efficiency. Addressing these bottlenecks is crucial for achieving optimal output

Authors

Publication Details

Journal
International Journal of Integrated Engineering
Published
2024-08-12
DOI
https://doi.org/10.30880/ijie.2024.16.05.029
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation for The Production Process of The Cover Plate Components Using Time Study Technique: A Case Study

Shahrul Azmir Osman, Aida Husna Ahmad, Saliza Azlina Osman, Mohd Hazrein Jamaludin
International Journal of Integrated Engineering
Manufacturing Process and Optimization
article

Evaluation for The Production Process of The Cover Plate Components Using Time Study Technique: A Case Study

Shahrul Azmir Osman, Aida Husna Ahmad, Saliza Azlina Osman, Mohd Hazrein Jamaludin
article en

Abstract

Time study plays a crucial role in optimizing production efficiency and resource utilization in manufacturing processes. Time study helps to counter problems that occurred in the production industry such as uneven task distribution, bottlenecks, idle time, complexity, and time constraints. In this case study, a manufacturing company has been selected as a case study for time study which focused on packing department that produced cover plate component in order to identify the task time, normal time and standard time. There are 12 work elements that were identified in this case study and these work elements were grouped into 5 different workstations based on cycle time. As a result, among of 12 work elements, the first 7 work elements indicates that the processes did not show any delay, where the processes can be done in range of 12% to 31% faster than the expected standard time. Meanwhile the other 5 work elements indicates a delay in task completion, which is up to 43.63 seconds. In case of workstation analysis, workstation 1, 2 and 3 showcasing effective performance in terms of task completion, with 14.6% to 31.1% faster than the standard time. However, for workstation 4 and 5 were recorded a procrastinate process time about 8% and 11%, which can translated as 30.3 secondsand 77.7 seconds, respectively.As a conclusion, the analysis of manufacturing task efficiency identified elements H, I, J, K, and L as needing improvement. Conversely, elements A, B, C, D, E, F, and G are performing well. Workstations 4 and 5 are bottlenecks that hinder overall production efficiency. Addressing these bottlenecks is crucial for achieving optimal output

International Journal of Integrated EngineeringVol. 16(5)
Universiti Tun Hussein Onn Malaysia
Openalex Percentile: Top 80%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.