A hybrid particle swarm optimization approach for explicit flexibility procurement in distribution network planning

• Incorporates market-based flexibility procurement to distribution system planning. • Hybrid approach that combines binary particle swarm and linear programming. • Case study for real 500 bus MV grid in Spain. • Procurement of flexibility services reduces network reinforcement investment by 14% • Sensitivity to calculate cost and availability thresholds that make flexibility competitive. Flexibility services enable distribution system operators to actively manage the grid for accommodating demand and generation growth while potentially reducing or delaying investments in grid reinforcements. This paper proposes a novel hybrid particle swarm optimization and linear programming methodology that analyzes explicit flexibility procurement as an alternative to conventional network reinforcements in electricity distribution network planning. The distribution system planning problem is decomposed into a master problem and an inner problem. Binary particle swarm optimization (BPSO) is used to determine the optimal investment decisions, binary variables, from a set of candidate grid reinforcements in the master problem. At the inner linear programming optimization problem, a market-based procurement of flexibility services is performed. The inner optimization problem obtains the total cost of flexibility and the volume of flexibility at each network bus required to defer or avoid part of the grid reinforcements. A real 500-bus medium voltage network is used to validate the proposed methodology. Results illustrate cost-effective network plans that combine flexibility procurement with network reinforcements. A sensitivity to the cost and availability of flexibility services is also conducted to calculate the thresholds where flexibility becomes an efficient alternative to reinforcing the network.

Authors

Institutions

Publication Details

Journal
International Journal of Electrical Power & Energy Systems
Published
2024-09-08
DOI
https://doi.org/10.1016/j.ijepes.2024.110215
Citations
8
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
1.67

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A hybrid particle swarm optimization approach for explicit flexibility procurement in distribution network planning

Tomás Gómez San Román, Beatriz Alonso, Miguel Martínez, Pablo Frías et al.
8 citations
International Journal of Electrical Power & Energy Systems
Smart Grid Energy Management
1.67
article

A hybrid particle swarm optimization approach for explicit flexibility procurement in distribution network planning

Tomás Gómez San Román, Beatriz Alonso, Miguel Martínez, Pablo Frías, Carlos Mateo
article en
8 citations

Abstract

• Incorporates market-based flexibility procurement to distribution system planning. • Hybrid approach that combines binary particle swarm and linear programming. • Case study for real 500 bus MV grid in Spain. • Procurement of flexibility services reduces network reinforcement investment by 14% • Sensitivity to calculate cost and availability thresholds that make flexibility competitive. Flexibility services enable distribution system operators to actively manage the grid for accommodating demand and generation growth while potentially reducing or delaying investments in grid reinforcements. This paper proposes a novel hybrid particle swarm optimization and linear programming methodology that analyzes explicit flexibility procurement as an alternative to conventional network reinforcements in electricity distribution network planning. The distribution system planning problem is decomposed into a master problem and an inner problem. Binary particle swarm optimization (BPSO) is used to determine the optimal investment decisions, binary variables, from a set of candidate grid reinforcements in the master problem. At the inner linear programming optimization problem, a market-based procurement of flexibility services is performed. The inner optimization problem obtains the total cost of flexibility and the volume of flexibility at each network bus required to defer or avoid part of the grid reinforcements. A real 500-bus medium voltage network is used to validate the proposed methodology. Results illustrate cost-effective network plans that combine flexibility procurement with network reinforcements. A sensitivity to the cost and availability of flexibility services is also conducted to calculate the thresholds where flexibility becomes an efficient alternative to reinforcing the network.

International Journal of Electrical Power & Energy SystemsVol. 161
Telnet Redes Inteligentes (Spain) (ES), Universidad Pontificia Comillas (ES)
Centro para el Desarrollo Tecnológico Industrial, Ministerio de Ciencia e Innovación
Openalex Percentile: Top 16%
Smart Grid Energy Management
1.67
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.