Analisis Koordinasi Unit Ramp Handling Dengan Unit Pasasi Dalam Mencapai Ground Time Maskapai Citilink di Bandar Udara Sultan Thaha Jambi

Ramp handling is the activity that coordinates all operations occurring from the moment the aircraft blocks on until it blocks off, ensuring that departures are on schedule while considering flight safety factors. One of the coordination tasks performed by ramp handling personnel to achieve the established ground time for the aircraft is to coordinate with the passenger service unit to determine the number of passengers and the amount of baggage that will be departing, as well as during the boarding process for passengers onto the aircraft. Additionally, they coordinate regarding the completeness of flight documents and ensure that all procedures are carried out properly and in accordance with applicable regulations in a timely manner. The purpose of this research is to understand the coordination between the ramp unit and the passenger service unit in achieving ground time at Citilink Airlines, to identify the factors and obstacles that may affect ground time, and to determine the efforts made to achieve ground time at Citilink Airlines. The purpose of this research is to understand the coordination between the ramp unit and the passenger services unit in achieving ground time at Citilink Airlines, to identify the factors and obstacles that may affect ground time, and to determine the efforts made to achieve ground time at Citilink Airlines.This study analyzes the coordination between ramp handling staff and passenger services personnel to achieve ground time for Citilink Airlines at Sultan Thaha Airport using qualitative research methods. The data sources utilized include primary data obtained from interviews, observations, and documentation, as well as secondary data. The research findings indicate that the coordination between ramp handling staff and passenger services personnel is well-established in achieving ground time for Citilink Airlines. However, there are factors that influence ground time, such as late arrivals, passenger delays, environmental factors, Air Traffic Control (ATC) issues, and technical factors. Efforts made to achieve ground time include implementing quick handling, issuing TDAM (Technical Delay Aircraft Maintenance), and securing manpower support to ensure timely operations.

Authors

Institutions

Publication Details

Journal
Jurnal Ilmiah Dan Karya Mahasiswa
Published
2024-08-21
DOI
https://doi.org/10.54066/jikma.v2i4.2347
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Koordinasi Unit Ramp Handling Dengan Unit Pasasi Dalam Mencapai Ground Time Maskapai Citilink di Bandar Udara Sultan Thaha Jambi

Khairunnisa Maizara, Sri Sutarwati
Jurnal Ilmiah Dan Karya Mahasiswa
Urban Transport Systems Analysis
article

Analisis Koordinasi Unit Ramp Handling Dengan Unit Pasasi Dalam Mencapai Ground Time Maskapai Citilink di Bandar Udara Sultan Thaha Jambi

Khairunnisa Maizara, Sri Sutarwati
article en

Abstract

Ramp handling is the activity that coordinates all operations occurring from the moment the aircraft blocks on until it blocks off, ensuring that departures are on schedule while considering flight safety factors. One of the coordination tasks performed by ramp handling personnel to achieve the established ground time for the aircraft is to coordinate with the passenger service unit to determine the number of passengers and the amount of baggage that will be departing, as well as during the boarding process for passengers onto the aircraft. Additionally, they coordinate regarding the completeness of flight documents and ensure that all procedures are carried out properly and in accordance with applicable regulations in a timely manner. The purpose of this research is to understand the coordination between the ramp unit and the passenger service unit in achieving ground time at Citilink Airlines, to identify the factors and obstacles that may affect ground time, and to determine the efforts made to achieve ground time at Citilink Airlines. The purpose of this research is to understand the coordination between the ramp unit and the passenger services unit in achieving ground time at Citilink Airlines, to identify the factors and obstacles that may affect ground time, and to determine the efforts made to achieve ground time at Citilink Airlines.This study analyzes the coordination between ramp handling staff and passenger services personnel to achieve ground time for Citilink Airlines at Sultan Thaha Airport using qualitative research methods. The data sources utilized include primary data obtained from interviews, observations, and documentation, as well as secondary data. The research findings indicate that the coordination between ramp handling staff and passenger services personnel is well-established in achieving ground time for Citilink Airlines. However, there are factors that influence ground time, such as late arrivals, passenger delays, environmental factors, Air Traffic Control (ATC) issues, and technical factors. Efforts made to achieve ground time include implementing quick handling, issuing TDAM (Technical Delay Aircraft Maintenance), and securing manpower support to ensure timely operations.

Jurnal Ilmiah Dan Karya MahasiswaVol. 2(4)
Institut Sains dan Teknologi Terpadu Surabaya (ID)
Openalex Percentile: Top 83%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.