Effects of check dam construction on sediment production and topographic changes in a gully in the Loess Plateau: A rainfall simulation experiment

Abstract To maintain a reasonable sediment regulation system in the Loess Plateau, it is critical to determine the effects of check dam construction on sediment production and topographic changes. An indoor simulation experiment was conducted to investigate sediment production at the outlet section of the gully and micro‐topographic changes within the channel before and after dam construction. The results showed that check dam significantly affected the run‐off and sediment transport processes in the watershed. Specifically, the cross‐sectional morphology index ( η ) and the width‐depth ratio increased by 10.23% and 40.44%, respectively, while sediment content and particle size decreased by 39.29% and 18.58%, respectively. Additionally, the relative importance of section parameters and micro‐topographic parameters that affect sediment production rate and particle size was ranked using the random forest algorithm. The roughness after check dam construction was identified as a relatively important topographic factor affecting sediment production and particle selection by erosion. These findings provide valuable information for future check dam construction and development in the Loess Plateau region.

Authors

Institutions

Publication Details

Journal
Hydrological Processes
Published
2024-09-01
DOI
https://doi.org/10.1002/hyp.15271
Citations
2
Primary Topic
Soil erosion and sediment transport
Type
article
Field-Weighted Citation Impact
0.67
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effects of check dam construction on sediment production and topographic changes in a gully in the Loess Plateau: A rainfall simulation experiment

Zhiwei Cui, Shaobo Xue, Zhenzhou Shen, Peng Li et al.
2 citations
Hydrological Processes
Soil erosion and sediment transport
0.67
article

Effects of check dam construction on sediment production and topographic changes in a gully in the Loess Plateau: A rainfall simulation experiment

Zhiwei Cui, Shaobo Xue, Zhenzhou Shen, Peng Li, Zhanbin Li
article en
2 citations

Abstract

Abstract To maintain a reasonable sediment regulation system in the Loess Plateau, it is critical to determine the effects of check dam construction on sediment production and topographic changes. An indoor simulation experiment was conducted to investigate sediment production at the outlet section of the gully and micro‐topographic changes within the channel before and after dam construction. The results showed that check dam significantly affected the run‐off and sediment transport processes in the watershed. Specifically, the cross‐sectional morphology index ( η ) and the width‐depth ratio increased by 10.23% and 40.44%, respectively, while sediment content and particle size decreased by 39.29% and 18.58%, respectively. Additionally, the relative importance of section parameters and micro‐topographic parameters that affect sediment production rate and particle size was ranked using the random forest algorithm. The roughness after check dam construction was identified as a relatively important topographic factor affecting sediment production and particle selection by erosion. These findings provide valuable information for future check dam construction and development in the Loess Plateau region.

Hydrological ProcessesVol. 38(9)
Institute of Soil and Water Conservation (CN), Xi'an University of Technology (CN), Ministry of Water Resources of the People's Republic of China (CN), Yellow River Institute of Hydraulic Research (CN)
Life in Land
Openalex Percentile: Top 27%
Soil erosion and sediment transport
0.67
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.