Voltage Quality Improvement with Shunt Bank Capasitor and Transformer Tap

Morocco Feeder Tapung Department is 20 kV feeder with the largest voltage drop in the PT. PLN (PERSERO), ULP Duri. The voltage drop was 16% of the nominal voltage. This study conducted voltage repairs on the medium and low voltage sides to strive for voltage increase to achieve standardization. The first stage of repair was to increase the tap by 5% on the secondary side of the Unit 1 distribution transformer of the Balai Pungut Substation. The second stage of repair was by placing a shunt capacitor bank with a capacity of 400 kVAR on bus 172. The third stage of repair was by increasing the tap of transformer by 2.5% and 5% on the secondary side of 32 and 13 distribution transformers. The result, after simulating the lowest voltage value on the medium voltage network is 91.69% and on the low voltage network is 90.47%. So that the voltage value obtained after performing the above repair measures resulted in voltage repair that has met the standard SPLN 1: 1987 which is 5 % and -10% against nominal voltage.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.47191/etj/v9i08.35
Primary Topic
Power Quality and Harmonics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Voltage Quality Improvement with Shunt Bank Capasitor and Transformer Tap

Zulfatri Aini, Sepannur Bandri, Liliana Liliana
Power Quality and Harmonics
article

Voltage Quality Improvement with Shunt Bank Capasitor and Transformer Tap

Zulfatri Aini, Sepannur Bandri, Liliana Liliana
article en

Abstract

Morocco Feeder Tapung Department is 20 kV feeder with the largest voltage drop in the PT. PLN (PERSERO), ULP Duri. The voltage drop was 16% of the nominal voltage. This study conducted voltage repairs on the medium and low voltage sides to strive for voltage increase to achieve standardization. The first stage of repair was to increase the tap by 5% on the secondary side of the Unit 1 distribution transformer of the Balai Pungut Substation. The second stage of repair was by placing a shunt capacitor bank with a capacity of 400 kVAR on bus 172. The third stage of repair was by increasing the tap of transformer by 2.5% and 5% on the secondary side of 32 and 13 distribution transformers. The result, after simulating the lowest voltage value on the medium voltage network is 91.69% and on the low voltage network is 90.47%. So that the voltage value obtained after performing the above repair measures resulted in voltage repair that has met the standard SPLN 1: 1987 which is 5 % and -10% against nominal voltage.

Vol. 09(08)
Enugu State University of Science and Technology (NG), Universitas Islam Negeri Sultan Syarif Kasim Riau (ID)
Openalex Percentile: Top 88%
Power Quality and Harmonics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.