Evaluation of Runway Capacity at Fatmawati Soekarno Airport, Bengkulu

Fatmawati Soekarno Airport is one of the airports that acts as the main gateway for air transportation and the growth of the tourism economy in Bengkulu City. From the results of the study, it is known that for condition 1) the runway capacity in existing conditions in 2023 is for 30 departure operations, 25 arrival operations and 25 mixed operations with 10 aircraft movements, the capacity in existing conditions is still sufficient, but it is known that the runway needs to be added along 933 m. Meanwhile, the analysis of runway capacity in condition 2) for 30 departure operations, 24 arrival operations and 24 mixed operations with 28 aircraft movements, the current capacity is not sufficient for this movement, and geometrically to serve the international scale, it is necessary to extend the runway 717 m from the existing ideal condition equipped with runway shoulder and clearway. And the results of the analysis of condition 3) runway capacity for 30 departure operations, 26 arrival operations and 22 mixed operations with 72 aircraft movements.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.47191/etj/v9i08.37
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Runway Capacity at Fatmawati Soekarno Airport, Bengkulu

Reni Karno Kinasih, Widodo Budi Dermawan, Muhammad Isradi, Allwy Silda Sabania
Urban Transport Systems Analysis
article

Evaluation of Runway Capacity at Fatmawati Soekarno Airport, Bengkulu

Reni Karno Kinasih, Widodo Budi Dermawan, Muhammad Isradi, Allwy Silda Sabania
article en

Abstract

Fatmawati Soekarno Airport is one of the airports that acts as the main gateway for air transportation and the growth of the tourism economy in Bengkulu City. From the results of the study, it is known that for condition 1) the runway capacity in existing conditions in 2023 is for 30 departure operations, 25 arrival operations and 25 mixed operations with 10 aircraft movements, the capacity in existing conditions is still sufficient, but it is known that the runway needs to be added along 933 m. Meanwhile, the analysis of runway capacity in condition 2) for 30 departure operations, 24 arrival operations and 24 mixed operations with 28 aircraft movements, the current capacity is not sufficient for this movement, and geometrically to serve the international scale, it is necessary to extend the runway 717 m from the existing ideal condition equipped with runway shoulder and clearway. And the results of the analysis of condition 3) runway capacity for 30 departure operations, 26 arrival operations and 22 mixed operations with 72 aircraft movements.

Vol. 09(08)
Mercu Buana University (ID)
Openalex Percentile: Top 83%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.