Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project

A construction project is a series of activities limited by resources and time to achieve construction results with good quality standards. Each project stage is inseparable from various risks and uncertainties that affect quality and quantity. Construction projects do not always run smoothly and often face problems related to the stakeholders' influence. The Grand Batavia project has numerous internal and external stakeholders involved, and the project has experienced delays in project completion. Researchers take parameters in time performance by analyzing the stakeholder risks in a project. Therefore, the project time can be properly achieved. This study aims to determine the risk factors and steps or appropriate actions for stakeholder risks based on PMBOK 2013 to improve project time performance on subsequent projects.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.47191/etj/v9i08.45
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project

Mohamad Sobirin
Management and Optimization Techniques
article

Stakeholder Risk Analysis Based on PMBOK to Improve Time Performance of Grand Batavia Tangerang Project

Mohamad Sobirin
article en

Abstract

A construction project is a series of activities limited by resources and time to achieve construction results with good quality standards. Each project stage is inseparable from various risks and uncertainties that affect quality and quantity. Construction projects do not always run smoothly and often face problems related to the stakeholders' influence. The Grand Batavia project has numerous internal and external stakeholders involved, and the project has experienced delays in project completion. Researchers take parameters in time performance by analyzing the stakeholder risks in a project. Therefore, the project time can be properly achieved. This study aims to determine the risk factors and steps or appropriate actions for stakeholder risks based on PMBOK 2013 to improve project time performance on subsequent projects.

Vol. 09(08)
Universitas Tama Jagakarsa (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.