Methodology Using Idle Capacity of Hydroelectric Substations for Sizing Floating Photovoltaic Plants

Photovoltaic (PV) generation has emerged as an alternative for reducing environmental impacts. Recently, floating photovoltaic (FPV) configurations have gained popularity, utilizing the water surface of reservoirs as installation sites. Recognizing its potential, this paper proposes a methodology to harness the idle capacity of substation facilities in hydroelectric power plants (HPP) for sizing FPV plants, aiming for the maximal utilization of the substation's capacity and promoting complementarity with HPP generation. The study introduces a sizing proposal for FPV based on complementarity with the worst day of HPP generation within a defined period, aiming to utilize 100% of the substation's capacity. As a case study, the FPV potential is identified as 59.81 GWp for Belo Monte and 55.35 GWp for Itaipu. This approach seeks to enhance the overall efficiency and sustainability of power generation systems by integrating FPV with existing hydroelectric infrastructure.

Authors

Institutions

Publication Details

Journal
IEEE Latin America Transactions
Published
2024-09-01
DOI
https://doi.org/10.1109/tla.2024.10669249
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Methodology Using Idle Capacity of Hydroelectric Substations for Sizing Floating Photovoltaic Plants

João Victor Teixeira Alves, Paulo César Marques de Carvalho, Gabryel Ferreira Alves, Bruno Rodrigues Alves Bezerra et al.
IEEE Latin America Transactions
Electric Power Systems and Control
article

Methodology Using Idle Capacity of Hydroelectric Substations for Sizing Floating Photovoltaic Plants

João Victor Teixeira Alves, Paulo César Marques de Carvalho, Gabryel Ferreira Alves, Bruno Rodrigues Alves Bezerra, Dionízio Porfírio de Assis, Margarete Freitas da Silva, Breno Bezerra Freitas, R Pereira, Mariana D'Oliveira Bulhões da Costa, Fernando Weslley Silva de Oliveira, Otacilio José de Macêdo Nunes, Celso Florindo de Oliveira Júnior, Edvaldo de Sousa Queiroz Filho, Felipe Teles do Nascimento, Milton Cezar da Silva, Carlos Alberto Teixeira Júnior
article en

Abstract

Photovoltaic (PV) generation has emerged as an alternative for reducing environmental impacts. Recently, floating photovoltaic (FPV) configurations have gained popularity, utilizing the water surface of reservoirs as installation sites. Recognizing its potential, this paper proposes a methodology to harness the idle capacity of substation facilities in hydroelectric power plants (HPP) for sizing FPV plants, aiming for the maximal utilization of the substation's capacity and promoting complementarity with HPP generation. The study introduces a sizing proposal for FPV based on complementarity with the worst day of HPP generation within a defined period, aiming to utilize 100% of the substation's capacity. As a case study, the FPV potential is identified as 59.81 GWp for Belo Monte and 55.35 GWp for Itaipu. This approach seeks to enhance the overall efficiency and sustainability of power generation systems by integrating FPV with existing hydroelectric infrastructure.

IEEE Latin America TransactionsVol. 22(9)
Universidade Federal do Ceará (BR)
Openalex Percentile: Top 88%
Electric Power Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.