Bowtie Methos-based Risk-management for Tunnel Construction
This study analyzed 250 tunnel incidents-46 from Korea and 204 from other parts of the world-to identify key geotechnical hazards associated with tunnel construction and implementing risk-management strategies.The identified hazards included portal-area issues, main sections situated in discontinuity or weak zones, shallow depths and valley areas, and post-face advance sections.The bowtie method was used to visualize specific events, treatments, and consequences pertaining to each hazard, and identify the relevant barriers and control measures.The bowtie risk-management model is a comprehensive approach for risk identification, assessment, and control.Thus, this study aims to enhance tunnel-construction safety by offering practical and effective risk-management and prevention strategies.
Authors
- S. Sonny Kim (ORCID: https://orcid.org/0000-0002-0548-9816)
Publication Details
- Journal
- Journal of the Korean Society of Mineral and Energy Resources Engineers
- Published
- 2024-08-31
- DOI
- https://doi.org/10.32390/ksmer.2024.61.4.296
- Primary Topic
- Geotechnical Engineering and Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00