Construction Cost Control Strategy of Finished House Based on BIM-5D

Building Information Modeling (BIM) technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost. This paper discusses the application of BIM-5D in the cost control of finished house construction, aiming to provide technical reference for China’s finished house project units, so that they can master how to realize the construction of cost control system based on BIM, the monitoring of the key coefficients of the cost, corrective action, to ensure that the project cost deviation is within the controllable range, and to make an effective guarantee for the economic benefits of the project construction.

Authors

Publication Details

Journal
Journal of World Architecture
Published
2024-09-02
DOI
https://doi.org/10.26689/jwa.v8i4.8134
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Cost Control Strategy of Finished House Based on BIM-5D

Xinyue Zhou, Dongchun Xia
Journal of World Architecture
BIM and Construction Integration
article

Construction Cost Control Strategy of Finished House Based on BIM-5D

Xinyue Zhou, Dongchun Xia
article en

Abstract

Building Information Modeling (BIM) technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost. This paper discusses the application of BIM-5D in the cost control of finished house construction, aiming to provide technical reference for China’s finished house project units, so that they can master how to realize the construction of cost control system based on BIM, the monitoring of the key coefficients of the cost, corrective action, to ensure that the project cost deviation is within the controllable range, and to make an effective guarantee for the economic benefits of the project construction.

Journal of World ArchitectureVol. 8(4)
Openalex Percentile: Top 85%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.