Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects

Purpose Megaproject supply chains involve multiple layers of stakeholders, leading to complex relationships and risks. The role of social interactions within these networks is unexplored. Therefore, an analysis of construction supply chain risk management from the perspective of social networks is essential to identify related stakeholders, their relationships and the social network risk factors. Design/methodology/approach About 65 risk factors, identified from literature and interviews, informed the development of a questionnaire for the study. Online questionnaires administered in Ghana and South Africa produced 120 valid responses. Feedback from the responses was ranked and assessed to determine the overall social network risk levels using the Normalised Mean and Fuzzy synthesis analysis methods. Findings About 24 risk factors were identified and classified into six groups: Client/Consultant-related, Community-related, Government-related, Industry Perception-related, Supplier-related and Stakeholder Opportunism. The top five social network risks identified include bribery, supplier monopoly, incomplete design teams, poor communication and lack of collaboration. Practical implications The study provides detailed evaluations of social network risks in Africa, and the findings will help in developing strategies to mitigate supply chain disruptions caused by these challenges. Originality/value This study contributes to the literature on supply chain risk management by offering context-specific insights into the social network perspective of megaprojects in Africa, which differs from those in developed countries.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2024-09-03
DOI
https://doi.org/10.1108/bepam-03-2024-0066
Citations
1
Primary Topic
Supply Chain Resilience and Risk Management
Type
article
Field-Weighted Citation Impact
0.55
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects

Jan A. Wium, Richard Kadan
1 citations
Built Environment Project and Asset Management
Supply Chain Resilience and Risk Management
0.55
article

Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects

Jan A. Wium, Richard Kadan
article en
1 citations

Abstract

Purpose Megaproject supply chains involve multiple layers of stakeholders, leading to complex relationships and risks. The role of social interactions within these networks is unexplored. Therefore, an analysis of construction supply chain risk management from the perspective of social networks is essential to identify related stakeholders, their relationships and the social network risk factors. Design/methodology/approach About 65 risk factors, identified from literature and interviews, informed the development of a questionnaire for the study. Online questionnaires administered in Ghana and South Africa produced 120 valid responses. Feedback from the responses was ranked and assessed to determine the overall social network risk levels using the Normalised Mean and Fuzzy synthesis analysis methods. Findings About 24 risk factors were identified and classified into six groups: Client/Consultant-related, Community-related, Government-related, Industry Perception-related, Supplier-related and Stakeholder Opportunism. The top five social network risks identified include bribery, supplier monopoly, incomplete design teams, poor communication and lack of collaboration. Practical implications The study provides detailed evaluations of social network risks in Africa, and the findings will help in developing strategies to mitigate supply chain disruptions caused by these challenges. Originality/value This study contributes to the literature on supply chain risk management by offering context-specific insights into the social network perspective of megaprojects in Africa, which differs from those in developed countries.

Built Environment Project and Asset ManagementVol. 15(1)
Stellenbosch University (ZA), Koforidua Technical University (GH)
Openalex Percentile: Top 22%
Supply Chain Resilience and Risk Management
0.55
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects — Jan A. Wium, Richard Kadan · Built Environment Project and Asset Management (2024) | TGRS Research Map | TGRS