Simulasi Metode Monte Carlo untuk Mengatur Sistem Antrian Truk

This research focuses on optimizing pozzolan truck queue management at PT. Danas Putra Mandiri through the application of the Monte Carlo method. The main objective of this research is to develop and implement a simulation application that is able to predict and calculate the average availability of trucks in a certain time unit, with the ultimate goal of increasing the company's operational efficiency. In industries that rely on the transportation of raw materials such as pozzolan, effective truck queue management is key to avoiding distribution delays and reducing operational costs. A queue is a service from one or more services that is caused by the need for services exceeding the capacity of the service or service facilities, so that customers who arrive cannot immediately receive service due to busyness in the service. The method used in this research is the Monte Carlo method. Monte Carlo is an experiment of various elements of probability using random samples. The Monte Carlo method is useful for solving quantitative problems with real or physical processing. This method has the ability to simulate and manage queues that occur in companies. PT Danas Putra Mandiri is one of the companies operating in the mining sector which supplies pozzolan to PT Semen Padang. The pozzolan delivery process uses trucks. The delivery process using trucks can affect the availability of the number of trucks in the company. The data used in this research is data from January 2023 - December 2023 with a total of 1619 data. Data taken through the admin of PT. DANAS PUTRA MANDIRI. Based on simulation predictions of queues on trucks, results were obtained with an average accuracy of 80.6%. The queuing simulation results show that the application of the Monte Carlo method can effectively reduce truck waiting times and increase the availability of trucks for rental, which ultimately contributes to increasing the company's operational efficiency.

Authors

Institutions

Publication Details

Journal
Jurnal KomtekInfo
Published
2024-09-03
DOI
https://doi.org/10.35134/komtekinfo.v11i3.552
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulasi Metode Monte Carlo untuk Mengatur Sistem Antrian Truk

Billy Hendrik, Dwana Abdi Juliantho, Gunadi Widi Nurcahyo
Jurnal KomtekInfo
Geotechnical and construction materials studies
article

Simulasi Metode Monte Carlo untuk Mengatur Sistem Antrian Truk

Billy Hendrik, Dwana Abdi Juliantho, Gunadi Widi Nurcahyo
article en

Abstract

This research focuses on optimizing pozzolan truck queue management at PT. Danas Putra Mandiri through the application of the Monte Carlo method. The main objective of this research is to develop and implement a simulation application that is able to predict and calculate the average availability of trucks in a certain time unit, with the ultimate goal of increasing the company's operational efficiency. In industries that rely on the transportation of raw materials such as pozzolan, effective truck queue management is key to avoiding distribution delays and reducing operational costs. A queue is a service from one or more services that is caused by the need for services exceeding the capacity of the service or service facilities, so that customers who arrive cannot immediately receive service due to busyness in the service. The method used in this research is the Monte Carlo method. Monte Carlo is an experiment of various elements of probability using random samples. The Monte Carlo method is useful for solving quantitative problems with real or physical processing. This method has the ability to simulate and manage queues that occur in companies. PT Danas Putra Mandiri is one of the companies operating in the mining sector which supplies pozzolan to PT Semen Padang. The pozzolan delivery process uses trucks. The delivery process using trucks can affect the availability of the number of trucks in the company. The data used in this research is data from January 2023 - December 2023 with a total of 1619 data. Data taken through the admin of PT. DANAS PUTRA MANDIRI. Based on simulation predictions of queues on trucks, results were obtained with an average accuracy of 80.6%. The queuing simulation results show that the application of the Monte Carlo method can effectively reduce truck waiting times and increase the availability of trucks for rental, which ultimately contributes to increasing the company's operational efficiency.

Jurnal KomtekInfo
Universitas Putra Indonesia "YPTK" (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.