Estimate the effort required to develop an Object-Oriented Software utilizing class point approach
The time and effort put into creating a piece of software may have a significant impact onwhether or not it is commercially successful. As a second step, we examine the found classes' localmethods and their interplay with the rest of the system to ascertain their complexity. In softwaredevelopment, estimation is the process of establishing the most precise measure of size required to designand test the programmed system, based on the software's needs. For calculating rough estimates of thesize of Objective Oriented OO products, we provide a technique that has resemblance to FP (FunctionPoint) we call it Class Point. Particularly, two metrics like number of methods and number of attributesare used for user objects that include design patterns.
Authors
- Manas Prasad Rout Manas Prasad Rout
- Prof. Sabyasachi Pattnaik Prof. Sabyasachi Pattnaik
Institutions
- Fakir Mohan University (IN)
Publication Details
- Journal
- International Journal of Information Technology and Management
- Published
- 2024-09-03
- DOI
- https://doi.org/10.29070/qnfwhh75
- Primary Topic
- Software Engineering Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00