A Common Structure for Factors that Enhance Synergy in Contractor Project Teams: Executive and Practitioner Perspectives

Synergy in a contractor project team improves performance by integrating diverse knowledge and skills among team members, enabling the achievement of project objectives. However, according to a literature review, factors that enhance synergy among contractor project teams from the perspective of executives and practitioners have rarely been discovered, revealing a knowledge gap that needs to be filled. Therefore, the aim of this study was to identify a common structure of such factors for executives and practitioners. Data collection involved a questionnaire survey targeting large contractors in Bangkok, Thailand. Then, we compared the mean importance and rank order of synergy factors, examined differences and similarities in synergy factors between executive and practitioner perspectives using the Mann–Whitney U test, and applied confirmatory factor analysis (CFA) for the data analysis. The differences and similarities show that executives and practitioners have similar perspectives on synergy factors. The CFA results validate a factor structure that enhances synergy. This synergy factor structure for executives and practitioners can be divided into five groups, with their standardized regression weights in parentheses: coordination (0.94), organizational structure (0.92), motivation (0.80), leadership (0.75), and planning and policy (0.69). These findings contribute to the body of knowledge and the state of practice by offering a practical framework to assist executives and practitioners in contractor organizations in identifying common measures and resource allocation based on the regression weights of synergy factors. This can improve synergy among contractor project teams, potentially resulting in better performance.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-09-02
DOI
https://doi.org/10.3390/buildings14092754
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.49

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Common Structure for Factors that Enhance Synergy in Contractor Project Teams: Executive and Practitioner Perspectives

Jakrapong Pongpeng, Nareerat Ratanawimol
1 citations
Buildings
Construction Project Management and Performance
0.49
article

A Common Structure for Factors that Enhance Synergy in Contractor Project Teams: Executive and Practitioner Perspectives

Jakrapong Pongpeng, Nareerat Ratanawimol
article en
1 citations

Abstract

Synergy in a contractor project team improves performance by integrating diverse knowledge and skills among team members, enabling the achievement of project objectives. However, according to a literature review, factors that enhance synergy among contractor project teams from the perspective of executives and practitioners have rarely been discovered, revealing a knowledge gap that needs to be filled. Therefore, the aim of this study was to identify a common structure of such factors for executives and practitioners. Data collection involved a questionnaire survey targeting large contractors in Bangkok, Thailand. Then, we compared the mean importance and rank order of synergy factors, examined differences and similarities in synergy factors between executive and practitioner perspectives using the Mann–Whitney U test, and applied confirmatory factor analysis (CFA) for the data analysis. The differences and similarities show that executives and practitioners have similar perspectives on synergy factors. The CFA results validate a factor structure that enhances synergy. This synergy factor structure for executives and practitioners can be divided into five groups, with their standardized regression weights in parentheses: coordination (0.94), organizational structure (0.92), motivation (0.80), leadership (0.75), and planning and policy (0.69). These findings contribute to the body of knowledge and the state of practice by offering a practical framework to assist executives and practitioners in contractor organizations in identifying common measures and resource allocation based on the regression weights of synergy factors. This can improve synergy among contractor project teams, potentially resulting in better performance.

BuildingsVol. 14(9)
King Mongkut's Institute of Technology Ladkrabang (TH)
King Mongkut's Institute of Technology Ladkrabang
Openalex Percentile: Top 32%
Construction Project Management and Performance
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.