Research on Building Process Optimization Framework Based on BIM-DT

Aiming at the problems of low integration of enterprises in various parts of the construction process, low productivity, serious waste of resources, and poor construction safety, this project constructs a framework for optimizing the construction process based on BIM-DT through an in-depth analysis of the characteristics and development status of the digital twin technology and BIM technology. The framework is a complete cycle system, including data management system, BIM modeling system, and digital twin model, which are integrated with each stage of survey and design, construction preparation, construction, and operation and maintenance, respectively. Finally, in the empirical study, the construction phase is taken as the object of study, and the data management system is constructed to comprehensively demonstrate the realization process of each system, and the BP neural network is utilized for fault diagnosis.

Institutions

Publication Details

Journal
Tehnicki vjesnik - Technical Gazette
Published
2024-09-01
DOI
https://doi.org/10.17559/tv-20240115001267
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Building Process Optimization Framework Based on BIM-DT

1 citations
Tehnicki vjesnik - Technical Gazette
BIM and Construction Integration
0.27
article

Research on Building Process Optimization Framework Based on BIM-DT

article en
1 citations

Abstract

Aiming at the problems of low integration of enterprises in various parts of the construction process, low productivity, serious waste of resources, and poor construction safety, this project constructs a framework for optimizing the construction process based on BIM-DT through an in-depth analysis of the characteristics and development status of the digital twin technology and BIM technology. The framework is a complete cycle system, including data management system, BIM modeling system, and digital twin model, which are integrated with each stage of survey and design, construction preparation, construction, and operation and maintenance, respectively. Finally, in the empirical study, the construction phase is taken as the object of study, and the data management system is constructed to comprehensively demonstrate the realization process of each system, and the BP neural network is utilized for fault diagnosis.

Tehnicki vjesnik - Technical GazetteVol. 31(5)
Liaoning Technical University (CN), Henan University of Urban Construction (CN)
Sustainable cities and communities
Openalex Percentile: Top 44%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on Building Process Optimization Framework Based on BIM-DT · Tehnicki vjesnik - Technical Gazette (2024) | TGRS Research Map | TGRS