Developing a cost-predictive model for hospital construction projects

Hospital construction projects require the integration of innovative technologies, making them complex and challenging to estimate accurately. Without reliable guidelines, lists of considerations, or predictive models, decision-makers may choose an unsuitable contractor, leading to cost overruns and project delays. This research used quantitative and qualitative methods, including expert opinions and focus groups, to address this issue and identify critical factors affecting cost estimation in hospital construction. Using multi-regression analysis, historical data was analyzed to establish a cost-predictive model. The study identified 24 factors that determine the most critical criteria affecting the cost estimation of hospital construction. This model can evaluate the estimated direct cost provided to decision-makers in the early stages of the project with over 95% accuracy. The research results can assist professionals in the construction industry in better estimating and managing the costs of hospital construction projects, reducing risks, and improving project outcomes. Key findings indicate that specific components such as site and electrical works show average percentage errors of 8.02% and 5.11%, respectively, highlighting areas prone to cost estimation inaccuracies. This insight directs focus on improving accuracy in these critical sectors, thus further refining cost management strategies for hospital construction projects.

Authors

Institutions

Publication Details

Journal
Journal of Asian Architecture and Building Engineering
Published
2024-08-31
DOI
https://doi.org/10.1080/13467581.2024.2397119
Citations
2
Primary Topic
Healthcare Operations and Scheduling Optimization
Type
article
Field-Weighted Citation Impact
1.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Developing a cost-predictive model for hospital construction projects

Naif M. Alsanabani, Khalid S. Al-Gahtani, Abdulmohsen S. Almohsen, Mohammad Y. Alriabi
2 citations
Journal of Asian Architecture and Building Engineering
Healthcare Operations and Scheduling Optimization
1.49
article

Developing a cost-predictive model for hospital construction projects

Naif M. Alsanabani, Khalid S. Al-Gahtani, Abdulmohsen S. Almohsen, Mohammad Y. Alriabi
article en
2 citations

Abstract

Hospital construction projects require the integration of innovative technologies, making them complex and challenging to estimate accurately. Without reliable guidelines, lists of considerations, or predictive models, decision-makers may choose an unsuitable contractor, leading to cost overruns and project delays. This research used quantitative and qualitative methods, including expert opinions and focus groups, to address this issue and identify critical factors affecting cost estimation in hospital construction. Using multi-regression analysis, historical data was analyzed to establish a cost-predictive model. The study identified 24 factors that determine the most critical criteria affecting the cost estimation of hospital construction. This model can evaluate the estimated direct cost provided to decision-makers in the early stages of the project with over 95% accuracy. The research results can assist professionals in the construction industry in better estimating and managing the costs of hospital construction projects, reducing risks, and improving project outcomes. Key findings indicate that specific components such as site and electrical works show average percentage errors of 8.02% and 5.11%, respectively, highlighting areas prone to cost estimation inaccuracies. This insight directs focus on improving accuracy in these critical sectors, thus further refining cost management strategies for hospital construction projects.

Journal of Asian Architecture and Building EngineeringVol. 24(5)
King Saud University (SA)
Industry, innovation and infrastructure
Openalex Percentile: Top 18%
Healthcare Operations and Scheduling Optimization
1.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Developing a cost-predictive model for hospital construction projects — Naif M. Alsanabani, Khalid S. Al-Gahtani, et al. · Journal of Asian Architecture and Building Engineering (2024) | TGRS Research Map | TGRS