Risk Management of Highly Constrained Construction Projects

Risk management of highly constrained construction projects is a valuable process to achieve project goals, minimize threats, and improve the performance of the projects. Constraints are the main obstacles to meeting the project targets. Every project has at least one constraint so the case of Constructing a construction project with ideal performance without any constraints is a theoretical case. Existing constraints are positive issues to determine the performance of a system, gradually elevation for them, and improving its performance. This research aims to determine the current risk factors of highly constrained construction projects. Qualitative and quantitative analysis for them using improved questionnaire tools that help in project enhancement. After using a wide literature review, the study listed 34 risk factors divided into nine categories. Then, we designed a questionnaire and distributed it to rank these factors according to their probability and impact on time and cost. Based on two methods in evaluating (Relative Important Index and a modified fuzzy group decision-making approach (FGDMA)), we performed a statistical analysis for all collected data using (Statistical Package for the Social Sciences) SPSS Ver.25 software, Analyzing the reliability, Cronbach’s alpha coefficient, Chi-Square Test, Person correlation, T-test, and using ANOVA analysis to find out the effect of all independent variables on dependent variables.

Authors

Institutions

Publication Details

Journal
Engineering Research Journal
Published
2024-08-31
DOI
https://doi.org/10.21608/erj.2024.377261
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Management of Highly Constrained Construction Projects

Ahmed Mohammed Abdelalim, Mohamed Tantawy, Sarah Saeed, Sara Khalid Mohamed
Engineering Research Journal
Construction Project Management and Performance
article

Risk Management of Highly Constrained Construction Projects

Ahmed Mohammed Abdelalim, Mohamed Tantawy, Sarah Saeed, Sara Khalid Mohamed
article en

Abstract

Risk management of highly constrained construction projects is a valuable process to achieve project goals, minimize threats, and improve the performance of the projects. Constraints are the main obstacles to meeting the project targets. Every project has at least one constraint so the case of Constructing a construction project with ideal performance without any constraints is a theoretical case. Existing constraints are positive issues to determine the performance of a system, gradually elevation for them, and improving its performance. This research aims to determine the current risk factors of highly constrained construction projects. Qualitative and quantitative analysis for them using improved questionnaire tools that help in project enhancement. After using a wide literature review, the study listed 34 risk factors divided into nine categories. Then, we designed a questionnaire and distributed it to rank these factors according to their probability and impact on time and cost. Based on two methods in evaluating (Relative Important Index and a modified fuzzy group decision-making approach (FGDMA)), we performed a statistical analysis for all collected data using (Statistical Package for the Social Sciences) SPSS Ver.25 software, Analyzing the reliability, Cronbach’s alpha coefficient, Chi-Square Test, Person correlation, T-test, and using ANOVA analysis to find out the effect of all independent variables on dependent variables.

Engineering Research JournalVol. 183(3)
El Shorouk Academy (EG), Higher Institute of Engineering (EG), Helwan University (EG)
Openalex Percentile: Top 83%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Management of Highly Constrained Construction Projects — Ahmed Mohammed Abdelalim, Mohamed Tantawy, et al. · Engineering Research Journal (2024) | TGRS Research Map | TGRS