Thinking Outside the Reservoir: How TRWD Is Using Constructed Wetlands to Defer Building the Next Reservoir

Due to a need for additional water supply compounded by urban growth and record droughts in Texas, many utilities are looking to supplement their water supplies by building new reservoirs or undertaking other large and expensive water supply projects. As an alternative source of raw water, Tarrant Regional Water District (TRWD) is using constructed wetlands to defer construction of new reservoirs. TRWD is designing and permitting the new Cedar Creek Wetlands. The purpose of the project is to withdraw water from the Trinity River, pass it through a wetland system for natural treatment, and then pump the polished water into the Cedar Creek Reservoir. This will increase TRWD’s water supply, especially during periods of drought, at a lower cost. This paper will discuss three main topics: the purpose and benefit of constructed wetlands, including TRWD’s experience using their George W. Shannon Wetlands located at Richland Chambers Reservoir; TRWD’s efforts and lessons learned over the past 10 years in planning for the project; and technical considerations for moving water through the wetlands system. This will be the first paper on this project and future papers will focus on the design and construction of large diameter pipelines and facilities. Wetlands improve water quality, control erosion, and enhance stream flows while providing habitat for diverse species and offering recreational opportunities. The constructed wetland projects discussed in this paper utilize these natural processes to treat effluent dominated river water while providing a dependable water supply for TRWD’s customers. They have proven to be more cost effective and yield a net environmental benefit when compared to the construction of large surface water reservoirs. In 2013, TRWD proceeded with a 30% design of the Cedar Creek Wetlands system, to allow TRWD to secure the property needed for the project. Early planning resulted in substantial cost savings for TRWD for land and easements. The Cedar Creek Wetlands system has a design capacity of 175,000 acre-feet per year, and consists of a raw water intake and river pump station that sends flow through two miles of parallel 78-in. and 48-in. pipelines to 2,550 wetted acres of treatment wetland cells, a finished water intake and pump station that sends flow through a 10-mi long, 90-in. pipeline to a two-cell balancing reservoir, energy dissipation structure, and outfall to the Cedar Creek Reservoir. This paper will also examine TRWD’s primary technical considerations for moving water through each component of the wetlands system.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.076
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thinking Outside the Reservoir: How TRWD Is Using Constructed Wetlands to Defer Building the Next Reservoir

David G. Schroeder, J. Karl Johnson, Stephen Bianchetta, Christopher Haeckler et al.
Water resources management and optimization
article

Thinking Outside the Reservoir: How TRWD Is Using Constructed Wetlands to Defer Building the Next Reservoir

David G. Schroeder, J. Karl Johnson, Stephen Bianchetta, Christopher Haeckler, Chris Zachry, Alan Swartz
article en

Abstract

Due to a need for additional water supply compounded by urban growth and record droughts in Texas, many utilities are looking to supplement their water supplies by building new reservoirs or undertaking other large and expensive water supply projects. As an alternative source of raw water, Tarrant Regional Water District (TRWD) is using constructed wetlands to defer construction of new reservoirs. TRWD is designing and permitting the new Cedar Creek Wetlands. The purpose of the project is to withdraw water from the Trinity River, pass it through a wetland system for natural treatment, and then pump the polished water into the Cedar Creek Reservoir. This will increase TRWD’s water supply, especially during periods of drought, at a lower cost. This paper will discuss three main topics: the purpose and benefit of constructed wetlands, including TRWD’s experience using their George W. Shannon Wetlands located at Richland Chambers Reservoir; TRWD’s efforts and lessons learned over the past 10 years in planning for the project; and technical considerations for moving water through the wetlands system. This will be the first paper on this project and future papers will focus on the design and construction of large diameter pipelines and facilities. Wetlands improve water quality, control erosion, and enhance stream flows while providing habitat for diverse species and offering recreational opportunities. The constructed wetland projects discussed in this paper utilize these natural processes to treat effluent dominated river water while providing a dependable water supply for TRWD’s customers. They have proven to be more cost effective and yield a net environmental benefit when compared to the construction of large surface water reservoirs. In 2013, TRWD proceeded with a 30% design of the Cedar Creek Wetlands system, to allow TRWD to secure the property needed for the project. Early planning resulted in substantial cost savings for TRWD for land and easements. The Cedar Creek Wetlands system has a design capacity of 175,000 acre-feet per year, and consists of a raw water intake and river pump station that sends flow through two miles of parallel 78-in. and 48-in. pipelines to 2,550 wetted acres of treatment wetland cells, a finished water intake and pump station that sends flow through a 10-mi long, 90-in. pipeline to a two-cell balancing reservoir, energy dissipation structure, and outfall to the Cedar Creek Reservoir. This paper will also examine TRWD’s primary technical considerations for moving water through each component of the wetlands system.

Tarrant County College (US)
Openalex Percentile: Top 82%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.