Pipe Bursting Proof of Use for Water Main Replacement: Insights from the Washington Suburban Sanitary Commission Water Pilot Project

The Washington Suburban Sanitary Commission (WSSC Water) selected the Lanham Station Road Water Main Replacement Project (Lanham Station or project), an approximately 3-mi upgrade, as a pioneering testbed for pipe bursting technology. Three construction techniques, such as pipe bursting, relocation, and re-lay (same trench replacement), were meticulously implemented for comparison. Different types [restrained joint and fusible polyvinyl chloride (PVC)] and sizes (6–12 in.) of C-900 PVC pipe were installed and evaluated during the pipe bursting process. With construction completed in 2020, the pilot project identified the pros and cons of pipe bursting compared to conventional open cut methods, evaluated the performance of select PVC products, and assessed the applicability of pipe bursting under differing site conditions. The project demonstrated the advantages of water main replacement using pipe bursting and highlighted challenges that require further examination. Ultimately, the pilot project confirmed pipe bursting as a viable alternative for water main replacement projects and provided practical recommendations for standard specifications, construction methodologies, material selection guidelines, and engineering/designer checklists.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.002
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pipe Bursting Proof of Use for Water Main Replacement: Insights from the Washington Suburban Sanitary Commission Water Pilot Project

Keith A. Solomon, Thomas Payne, Yudu Wu
Water Systems and Optimization
article

Pipe Bursting Proof of Use for Water Main Replacement: Insights from the Washington Suburban Sanitary Commission Water Pilot Project

Keith A. Solomon, Thomas Payne, Yudu Wu
article en

Abstract

The Washington Suburban Sanitary Commission (WSSC Water) selected the Lanham Station Road Water Main Replacement Project (Lanham Station or project), an approximately 3-mi upgrade, as a pioneering testbed for pipe bursting technology. Three construction techniques, such as pipe bursting, relocation, and re-lay (same trench replacement), were meticulously implemented for comparison. Different types [restrained joint and fusible polyvinyl chloride (PVC)] and sizes (6–12 in.) of C-900 PVC pipe were installed and evaluated during the pipe bursting process. With construction completed in 2020, the pilot project identified the pros and cons of pipe bursting compared to conventional open cut methods, evaluated the performance of select PVC products, and assessed the applicability of pipe bursting under differing site conditions. The project demonstrated the advantages of water main replacement using pipe bursting and highlighted challenges that require further examination. Ultimately, the pilot project confirmed pipe bursting as a viable alternative for water main replacement projects and provided practical recommendations for standard specifications, construction methodologies, material selection guidelines, and engineering/designer checklists.

Waters (United States) (US), Providence College (US), University of Baltimore (US)
Clean water and sanitation
Openalex Percentile: Top 84%
Water Systems and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Pipe Bursting Proof of Use for Water Main Replacement: Insights from the Washington Suburban Sanitary Commission Water Pilot Project — Keith A. Solomon, Thomas Payne, et al. · (2024) | TGRS Research Map | TGRS