Connecting the Dots: How Trenchless Construction Opened Doors for a Wellfield Expansion in Fort Myers

Lee County Utilities undertook an expansion at the North Lee County Water Treatment Plant in Fort Myers, Florida, adding six raw groundwater production wells and a raw water transmission main with pipe up to 30 in. in diameter to meet North Lee County’s growing water needs. The project faced challenges due to limited pipeline routes, narrow right-of-way corridors, deep ditches, and restrictions on daytime road closures. There was only one practical route that connected all six well sites and delivered water from these sites to the plant. The design had to overcome challenges noted above, as well as concerns about public convenience, environmental considerations, and future maintenance. Lee County Utilities’ existing preference for HDPE pipe opened the door for installing over 87% of the transmission main via 27 horizontal directional drills for approximately 35,000 linear feet. This case study highlights the use of horizontal directional drilling trenchless technology to navigate the previously mentioned challenges in a limited pipeline corridor.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.040
Primary Topic
Construction Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Connecting the Dots: How Trenchless Construction Opened Doors for a Wellfield Expansion in Fort Myers

Jarah Parke, Trent M. D’Alessio, Larry Campanelli, Stephen MacEachern et al.
Construction Engineering and Safety
article

Connecting the Dots: How Trenchless Construction Opened Doors for a Wellfield Expansion in Fort Myers

Jarah Parke, Trent M. D’Alessio, Larry Campanelli, Stephen MacEachern, Albert Ruiz
article en

Abstract

Lee County Utilities undertook an expansion at the North Lee County Water Treatment Plant in Fort Myers, Florida, adding six raw groundwater production wells and a raw water transmission main with pipe up to 30 in. in diameter to meet North Lee County’s growing water needs. The project faced challenges due to limited pipeline routes, narrow right-of-way corridors, deep ditches, and restrictions on daytime road closures. There was only one practical route that connected all six well sites and delivered water from these sites to the plant. The design had to overcome challenges noted above, as well as concerns about public convenience, environmental considerations, and future maintenance. Lee County Utilities’ existing preference for HDPE pipe opened the door for installing over 87% of the transmission main via 27 horizontal directional drills for approximately 35,000 linear feet. This case study highlights the use of horizontal directional drilling trenchless technology to navigate the previously mentioned challenges in a limited pipeline corridor.

School District of Lee County (US), Stantec (Canada) (CA), University of South Florida Sarasota–Manatee (US)
Sustainable cities and communities
Openalex Percentile: Top 84%
Construction Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Connecting the Dots: How Trenchless Construction Opened Doors for a Wellfield Expansion in Fort Myers — Jarah Parke, Trent M. D’Alessio, et al. · (2024) | TGRS Research Map | TGRS