Repairing History: DC Water’s Experience Designing the Rehabilitation of a 150-Year-Old Sewer

The Northeast Boundary Trunk Sewer (NEBTS) was constructed between 1879 and 1894 and ranges from approximately 6 ft (1.8 m) to 23 ft (7 m) in diameter and is approximately 28,800 linear feet (LF) (8,778 m) in length. In 2018, DC Water commissioned a report on the condition of various sections of the sewer. Based on the results of the report, two sections/segments of the sewer required rehabilitation. Segment 1 has a circular cross section with a diameter of 22 ft (6.7 m). Segment 2 has a 9 ft (2.7 m) by 6 ft (1.8 m) wide egg-shaped cross section. DC Water tasked the Greeley and Hansen/Ramboll Joint Venture with analysis of rehabilitation alternatives. Once geopolymer was selected, the Joint Venture was tasked with a Finite Element Analysis to determine the thickness of the liner. Construction is anticipated to begin in Spring 2024 and finish in Summer 2025.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.032
Primary Topic
Water Governance and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Repairing History: DC Water’s Experience Designing the Rehabilitation of a 150-Year-Old Sewer

Renni Zhao, Haile Tsehayu, Steve Bian, Josh Crossen
Water Governance and Infrastructure
article

Repairing History: DC Water’s Experience Designing the Rehabilitation of a 150-Year-Old Sewer

Renni Zhao, Haile Tsehayu, Steve Bian, Josh Crossen
article en

Abstract

The Northeast Boundary Trunk Sewer (NEBTS) was constructed between 1879 and 1894 and ranges from approximately 6 ft (1.8 m) to 23 ft (7 m) in diameter and is approximately 28,800 linear feet (LF) (8,778 m) in length. In 2018, DC Water commissioned a report on the condition of various sections of the sewer. Based on the results of the report, two sections/segments of the sewer required rehabilitation. Segment 1 has a circular cross section with a diameter of 22 ft (6.7 m). Segment 2 has a 9 ft (2.7 m) by 6 ft (1.8 m) wide egg-shaped cross section. DC Water tasked the Greeley and Hansen/Ramboll Joint Venture with analysis of rehabilitation alternatives. Once geopolymer was selected, the Joint Venture was tasked with a Finite Element Analysis to determine the thickness of the liner. Construction is anticipated to begin in Spring 2024 and finish in Summer 2025.

District of Columbia Water and Sewer Authority (US), Chr. Hansen (Denmark) (DK)
Clean water and sanitation
Openalex Percentile: Top 78%
Water Governance and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Repairing History: DC Water’s Experience Designing the Rehabilitation of a 150-Year-Old Sewer — Renni Zhao, Haile Tsehayu, et al. · (2024) | TGRS Research Map | TGRS