Segmental Steel Sliplining: A Tale of Two Water Transmission Renewal Projects

HDR has been a trusted advisor to Aurora Water and Louisville Water Company for decades. Both water utilities have aging water infrastructure, large conveyance systems, and serve metropolitan areas. HDR was called upon by each to assist with the renewal of critical transmission pipelines within their systems to continue dependable water delivery to their customers. Although completed independently, the two projects used similar trenchless rehabilitation methods. This presentation will provide an overview of the design, delivery, and construction approaches provided for the $17.5M Aurora Rampart Delivery System 54-in. (1,350 mm) PCCP Steel Slipline and the $25.5M Louisville Water Company’s Eastern Parkway 48-in. (1,200 mm) CI Steel Slipline rehabilitation projects. Project challenges, design criteria, and different sliplining construction methods will be highlighted for each project. The presentation will conclude with a summary of lessons learned from the two different approaches for the design and construction of the sliplining projects.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.024
Primary Topic
Power Line Inspection Robots
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Segmental Steel Sliplining: A Tale of Two Water Transmission Renewal Projects

Keith Bushdiecker, Kevin Brian
Power Line Inspection Robots
article

Segmental Steel Sliplining: A Tale of Two Water Transmission Renewal Projects

Keith Bushdiecker, Kevin Brian
article en

Abstract

HDR has been a trusted advisor to Aurora Water and Louisville Water Company for decades. Both water utilities have aging water infrastructure, large conveyance systems, and serve metropolitan areas. HDR was called upon by each to assist with the renewal of critical transmission pipelines within their systems to continue dependable water delivery to their customers. Although completed independently, the two projects used similar trenchless rehabilitation methods. This presentation will provide an overview of the design, delivery, and construction approaches provided for the $17.5M Aurora Rampart Delivery System 54-in. (1,350 mm) PCCP Steel Slipline and the $25.5M Louisville Water Company’s Eastern Parkway 48-in. (1,200 mm) CI Steel Slipline rehabilitation projects. Project challenges, design criteria, and different sliplining construction methods will be highlighted for each project. The presentation will conclude with a summary of lessons learned from the two different approaches for the design and construction of the sliplining projects.

Swedish Water & Wastewater Association (SE)
Openalex Percentile: Top 86%
Power Line Inspection Robots
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Segmental Steel Sliplining: A Tale of Two Water Transmission Renewal Projects — Keith Bushdiecker, Kevin Brian · (2024) | TGRS Research Map | TGRS