Under a Creek and through the Woods… and a Golf Course, Dog Park, Baseball Fields… and Trail System

The Trinity River Authority of Texas (TRA) Segment 09BC-1 project is located within TRA’s Central Regional Wastewater System (CRWS). The CRWS service area is the largest within TRA, serving 21 customers by collecting and conveying wastewater flow through over 200 mi (322 km) of pipelines to its treatment plant. The Segment 09BC-1 project includes the replacement of five miles (8 km) of 30- to 54-in. (762- to 1,372-mm) unlined reinforced concrete pipe (RCP) originally constructed in 1984. The design and construction of the replacement pipeline were completed in three phases and involved extensive coordination with recreational properties, including a golf course owned by an international airport and a city park system with baseball fields, a dog park, and trail system. The construction of each phase highlighted certain challenges, such as maintaining project schedule for easements with time constraints, material waste due to unlocated utilities, and review of construction submittals for newly approved manufacturers.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.035
Primary Topic
American Sports and Literature
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Under a Creek and through the Woods… and a Golf Course, Dog Park, Baseball Fields… and Trail System

Carlos A. Ramos, Amanda Voss
American Sports and Literature
article

Under a Creek and through the Woods… and a Golf Course, Dog Park, Baseball Fields… and Trail System

Carlos A. Ramos, Amanda Voss
article en

Abstract

The Trinity River Authority of Texas (TRA) Segment 09BC-1 project is located within TRA’s Central Regional Wastewater System (CRWS). The CRWS service area is the largest within TRA, serving 21 customers by collecting and conveying wastewater flow through over 200 mi (322 km) of pipelines to its treatment plant. The Segment 09BC-1 project includes the replacement of five miles (8 km) of 30- to 54-in. (762- to 1,372-mm) unlined reinforced concrete pipe (RCP) originally constructed in 1984. The design and construction of the replacement pipeline were completed in three phases and involved extensive coordination with recreational properties, including a golf course owned by an international airport and a city park system with baseball fields, a dog park, and trail system. The construction of each phase highlighted certain challenges, such as maintaining project schedule for easements with time constraints, material waste due to unlocated utilities, and review of construction submittals for newly approved manufacturers.

Education Authority (GB)
Openalex Percentile: Top 81%
American Sports and Literature
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.