Making a Solid Choice: Tunnel Crossing Optimization under the Credit River

Stantec is working with the Region of Peel on the design of the Lakeshore Road Trunk Sewer to divert flows from GE Booth Water Resource Recovery Facility (WRRF) to the Clarkson WRRF. The sewer will be constructed from Jack Darling Memorial Park approximately 3.3 km, then crossing the Credit River and continuing an additional 1 km to Elmwood Avenue. Understanding the geology at this important crossing location is key in the design and construction of the project, driving the depth of the tunnel and appurtenances. Initial desktop geotechnical information and historic field investigations in the vicinity of the crossing indicated that there was a risk that the subsurface bedrock valley was deeper under and east of the river than to the west, extending under the east riverbank and adjacent public library resulting in mixed face tunneling at the originally planned elevation. Stantec undertook a comprehensive geotechnical field investigation followed by an evaluation of mixed face tunneling vs. deepening the sewer, so that it would remain in rock. The evaluation concluded that deepening the sewer had the most benefit to the Region from an overall construction, cost, and operations viewpoint.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.071
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Making a Solid Choice: Tunnel Crossing Optimization under the Credit River

Neil Harvey, Steven Fradkin, Sarah Lobo
Underground infrastructure and sustainability
article

Making a Solid Choice: Tunnel Crossing Optimization under the Credit River

Neil Harvey, Steven Fradkin, Sarah Lobo
article en

Abstract

Stantec is working with the Region of Peel on the design of the Lakeshore Road Trunk Sewer to divert flows from GE Booth Water Resource Recovery Facility (WRRF) to the Clarkson WRRF. The sewer will be constructed from Jack Darling Memorial Park approximately 3.3 km, then crossing the Credit River and continuing an additional 1 km to Elmwood Avenue. Understanding the geology at this important crossing location is key in the design and construction of the project, driving the depth of the tunnel and appurtenances. Initial desktop geotechnical information and historic field investigations in the vicinity of the crossing indicated that there was a risk that the subsurface bedrock valley was deeper under and east of the river than to the west, extending under the east riverbank and adjacent public library resulting in mixed face tunneling at the originally planned elevation. Stantec undertook a comprehensive geotechnical field investigation followed by an evaluation of mixed face tunneling vs. deepening the sewer, so that it would remain in rock. The evaluation concluded that deepening the sewer had the most benefit to the Region from an overall construction, cost, and operations viewpoint.

Stantec (United States) (US), Xi'an Peihua University (CN), Stantec (Canada) (CA)
Openalex Percentile: Top 85%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.