Avoiding Faults: AC Current Mitigation on a Large Diameter Steel Pipeline—Case Study

In 2015, the Willamette Water Supply Program (WWSP) in Beaverton, Oregon, was completing alignment selection for its new 1.67 m (66-in.) diameter, welded-steel water transmission pipeline. A “pinch point” in the alignment required the pipeline to pass within a reduced public right-of-way, “squeezed” between two electrical substations, and perpendicular to underground control, substation ground fault conduits, communication cables, and overhead transmission lines connecting the two substations. The existing electrical infrastructure and public utilities presented unique design and constructability challenges that included underground and overhead vertical clearances, potential impact of ground faults, and maintaining existing controls. Several methods of addressing the ground fault concerns were evaluated, including encasement, large diameter isolation flanges or joints, increased pipeline depth to attain a minimum separation distance, and modifications to the electrical facilities themselves. This paper presents the reasons for selecting this challenging pipeline alignment, the initial and intermediate mitigations considered, and the selected solutions.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.011
Primary Topic
Non-Destructive Testing Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Avoiding Faults: AC Current Mitigation on a Large Diameter Steel Pipeline—Case Study

Mike Britch, Joelle Bennett, Brien Clark, Scott Christensen et al.
Non-Destructive Testing Techniques
article

Avoiding Faults: AC Current Mitigation on a Large Diameter Steel Pipeline—Case Study

Mike Britch, Joelle Bennett, Brien Clark, Scott Christensen, M. Duffy
article en

Abstract

In 2015, the Willamette Water Supply Program (WWSP) in Beaverton, Oregon, was completing alignment selection for its new 1.67 m (66-in.) diameter, welded-steel water transmission pipeline. A “pinch point” in the alignment required the pipeline to pass within a reduced public right-of-way, “squeezed” between two electrical substations, and perpendicular to underground control, substation ground fault conduits, communication cables, and overhead transmission lines connecting the two substations. The existing electrical infrastructure and public utilities presented unique design and constructability challenges that included underground and overhead vertical clearances, potential impact of ground faults, and maintaining existing controls. Several methods of addressing the ground fault concerns were evaluated, including encasement, large diameter isolation flanges or joints, increased pipeline depth to attain a minimum separation distance, and modifications to the electrical facilities themselves. This paper presents the reasons for selecting this challenging pipeline alignment, the initial and intermediate mitigations considered, and the selected solutions.

French Corrosion Institute (FR), Line Corporation (Japan) (JP), Heritage Valley Beaver (US)
Climate action
Openalex Percentile: Top 86%
Non-Destructive Testing Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.