Construction Lessons Learned for Large Diameter Wastewater Piping Rehabilitation

The focus of this presentation is to highlight why detailed data collection is important during condition assessment and the need for continued coordination between the design engineer and condition assessment engineer to mitigate unexpected changes during the rehabilitation design process. The San Jose-Santa Clara Regional Wastewater Facility is now finishing Phase 2 of its Yard Piping Improvements Project, which included rehabilitating an 84-in. pipeline 5 years after its condition assessment and the changed pipeline conditions encountered. This paper presents an overview of the condition assessment approach and findings, rehabilitation design package preparation, including assumed construction allowances, a recount of how construction proceeded, and lessons learned from the City of San Jose’s perspective to save time and money during construction. Key takeaways: (1) Benefits of condition assessment for preparing rehabilitation design packages; (2) considerations during pipeline rehabilitation construction; and (3) lessons learned from Owner’s perspective.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.038
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Lessons Learned for Large Diameter Wastewater Piping Rehabilitation

Noy Phannavong, C.L. McAdams
Geotechnical Engineering and Underground Structures
article

Construction Lessons Learned for Large Diameter Wastewater Piping Rehabilitation

Noy Phannavong, C.L. McAdams
article en

Abstract

The focus of this presentation is to highlight why detailed data collection is important during condition assessment and the need for continued coordination between the design engineer and condition assessment engineer to mitigate unexpected changes during the rehabilitation design process. The San Jose-Santa Clara Regional Wastewater Facility is now finishing Phase 2 of its Yard Piping Improvements Project, which included rehabilitating an 84-in. pipeline 5 years after its condition assessment and the changed pipeline conditions encountered. This paper presents an overview of the condition assessment approach and findings, rehabilitation design package preparation, including assumed construction allowances, a recount of how construction proceeded, and lessons learned from the City of San Jose’s perspective to save time and money during construction. Key takeaways: (1) Benefits of condition assessment for preparing rehabilitation design packages; (2) considerations during pipeline rehabilitation construction; and (3) lessons learned from Owner’s perspective.

Black & Veatch (United Kingdom) (GB)
Clean water and sanitation
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.