The Theory and Practice of Designing a Seismically Resilient 72-in. Diameter Pipeline That Crosses the Wasatch Fault Zone

The Davis Aqueduct is a 22.5-mi-long pipeline made of reinforced concrete pipe ranging in diameter from 84 in. to 21 in. It is the only source of water for several cities in Weber and Davis Counties and in the Great Salt Lake Basin. The Aqueduct sits along the Wasatch front range of the Rocky Mountains and is within the Wasatch Fault Zone (WFZ) for much of the alignment. In addition to the seismic risk, the aqueduct is also at risk of damage from landslides, debris flows, and liquefaction. The Weber Basin Water Conservancy District (WBWCD) serves a population of over 500,000 in Weber and Davis Counties. WBWCD performed a risk assessment, condition assessment, and hydraulic evaluation of the Davis Aqueduct to define its long-term repair and replacement strategy and coordinated that strategy with the State of Utah’s Prepare60 initiative. To mitigate the risk associated with loss of service, the District proposed a parallel pipeline to accomplish two objectives: (1) increase hydraulic capacity, and (2) provide redundancy for the existing pipeline. A goal for the parallel pipeline project was to design the most resilient system possible to help WBWCD maintain high level-of-service goals for critical turnouts. In preliminary design, Brown and Caldwell conducted an alignment study and a geologic hazard assessment to identify, characterize, and define geological and seismic hazards in a potential pipeline corridor from the start of the existing aqueduct to the turnout to Weber Basin’s Davis North Water treatment plant. Seven alignments were considered, and a preferred alignment was selected that prioritized hazard avoidance before hazard mitigation. This paper focuses on the strategy implemented to avoid risks during preliminary design and how the pipe was designed to be resilient when crossing of the Wasatch Fault and passing through three zones with anticipated liquefaction and an area with slope instability. The final design included upgrading the bifurication structure which controls flow at the start of the pipeline, designing a pump station that allows the Davis Aqueduct to divert flow from or into an adjacent canal, and protecting the pipe from landslides on unstable slopes near the terminus of the pipeline and the hydraulic structure which controls flow at the end of pipeline.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.010
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Theory and Practice of Designing a Seismically Resilient 72-in. Diameter Pipeline That Crosses the Wasatch Fault Zone

Mike McReynolds, Ryan Davies, Susan Spore, Scott Paxman
Geotechnical Engineering and Underground Structures
article

The Theory and Practice of Designing a Seismically Resilient 72-in. Diameter Pipeline That Crosses the Wasatch Fault Zone

Mike McReynolds, Ryan Davies, Susan Spore, Scott Paxman
article en

Abstract

The Davis Aqueduct is a 22.5-mi-long pipeline made of reinforced concrete pipe ranging in diameter from 84 in. to 21 in. It is the only source of water for several cities in Weber and Davis Counties and in the Great Salt Lake Basin. The Aqueduct sits along the Wasatch front range of the Rocky Mountains and is within the Wasatch Fault Zone (WFZ) for much of the alignment. In addition to the seismic risk, the aqueduct is also at risk of damage from landslides, debris flows, and liquefaction. The Weber Basin Water Conservancy District (WBWCD) serves a population of over 500,000 in Weber and Davis Counties. WBWCD performed a risk assessment, condition assessment, and hydraulic evaluation of the Davis Aqueduct to define its long-term repair and replacement strategy and coordinated that strategy with the State of Utah’s Prepare60 initiative. To mitigate the risk associated with loss of service, the District proposed a parallel pipeline to accomplish two objectives: (1) increase hydraulic capacity, and (2) provide redundancy for the existing pipeline. A goal for the parallel pipeline project was to design the most resilient system possible to help WBWCD maintain high level-of-service goals for critical turnouts. In preliminary design, Brown and Caldwell conducted an alignment study and a geologic hazard assessment to identify, characterize, and define geological and seismic hazards in a potential pipeline corridor from the start of the existing aqueduct to the turnout to Weber Basin’s Davis North Water treatment plant. Seven alignments were considered, and a preferred alignment was selected that prioritized hazard avoidance before hazard mitigation. This paper focuses on the strategy implemented to avoid risks during preliminary design and how the pipe was designed to be resilient when crossing of the Wasatch Fault and passing through three zones with anticipated liquefaction and an area with slope instability. The final design included upgrading the bifurication structure which controls flow at the start of the pipeline, designing a pump station that allows the Davis Aqueduct to divert flow from or into an adjacent canal, and protecting the pipe from landslides on unstable slopes near the terminus of the pipeline and the hydraulic structure which controls flow at the end of pipeline.

Brown and Caldwell (United States) (US)
Climate action
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.