Hitting the Mark: Crossing the Guadalupe River with the Second Vertical-Curved Microtunnel in the United States

The New Braunfels Utilities Surface Water Treatment Plant Discharge Water Line is a 30-in./24-in. diameter potable water distribution line that required a 413 LF trenchless installation beneath the Guadalupe River. This installation had tight alignment tolerances, was beneath a river with highly incised embankment conditions and a 20-ft surface elevation difference between shaft locations, was next to an active pump station, and had inconsistent subsurface ground conditions. Three installation methods were considered: Horizontal Auger Boring, Horizontal Directional Drilling, and Vertical-curved Microtunneling. The project team selected the vertical-curved microtunnel method which reduced risk and allowed for an optimized alignment compared to other methods. Ultimately, it was utilized in a successful installation that satisfied all parties.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485590.028
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hitting the Mark: Crossing the Guadalupe River with the Second Vertical-Curved Microtunnel in the United States

Ashley Heckman, Robert Weinert, Jesse Guerra
Underground infrastructure and sustainability
article

Hitting the Mark: Crossing the Guadalupe River with the Second Vertical-Curved Microtunnel in the United States

Ashley Heckman, Robert Weinert, Jesse Guerra
article en

Abstract

The New Braunfels Utilities Surface Water Treatment Plant Discharge Water Line is a 30-in./24-in. diameter potable water distribution line that required a 413 LF trenchless installation beneath the Guadalupe River. This installation had tight alignment tolerances, was beneath a river with highly incised embankment conditions and a 20-ft surface elevation difference between shaft locations, was next to an active pump station, and had inconsistent subsurface ground conditions. Three installation methods were considered: Horizontal Auger Boring, Horizontal Directional Drilling, and Vertical-curved Microtunneling. The project team selected the vertical-curved microtunnel method which reduced risk and allowed for an optimized alignment compared to other methods. Ultimately, it was utilized in a successful installation that satisfied all parties.

Hough Ear Institute (US)
Sustainable cities and communities
Openalex Percentile: Top 85%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.