When a River Runs through It, You Need to Move It

The Red River which serves as the border between Minnesota and North Dakota has a history of flooding, causing billion dollars in damage. The US Army Corps of Engineers (USACE), along with other federal/state/local resources, embarked on a fast-tracked project to mitigate future flood damage—“Fargo Moorhead Area Diversion Project.” The critical purpose of this project is re-routing flow around the Fargo/Moorhead area via the construction of 30-mi channel that ranges from 200- to 300-ft wide. Before the channel was to be constructed, there were 107 utilities identified that conflicted with the channel. The majority of these utilities (gas, communication, electric, and water) were re-routed under the proposed diversion channel alignment via horizontal directional drilling. Combining some utilities and adding a few new ones—it was determined that 36 drills were required. This paper is a review of the process and installation of the relocated utilities.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.050
Primary Topic
Hydrology and Sediment Transport Processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

When a River Runs through It, You Need to Move It

Dylan R. Brown, P. Scott Laidlaw, Joseph Murray, Juan Doron
Hydrology and Sediment Transport Processes
article

When a River Runs through It, You Need to Move It

Dylan R. Brown, P. Scott Laidlaw, Joseph Murray, Juan Doron
article en

Abstract

The Red River which serves as the border between Minnesota and North Dakota has a history of flooding, causing billion dollars in damage. The US Army Corps of Engineers (USACE), along with other federal/state/local resources, embarked on a fast-tracked project to mitigate future flood damage—“Fargo Moorhead Area Diversion Project.” The critical purpose of this project is re-routing flow around the Fargo/Moorhead area via the construction of 30-mi channel that ranges from 200- to 300-ft wide. Before the channel was to be constructed, there were 107 utilities identified that conflicted with the channel. The majority of these utilities (gas, communication, electric, and water) were re-routed under the proposed diversion channel alignment via horizontal directional drilling. Combining some utilities and adding a few new ones—it was determined that 36 drills were required. This paper is a review of the process and installation of the relocated utilities.

Underground Systems (United States) (US)
Openalex Percentile: Top 86%
Hydrology and Sediment Transport Processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.