Confronting the Complexities of Large-Diameter Sewer Rehabilitation in a Highly Urbanized Setting

Urbanized areas around the globe face an increasingly urgent need to rehabilitate aging sewer infrastructure. Challenging projects in dense neighborhoods have long been deferred for their difficulty and are now rising to the top of the list of priorities. The Boston Water and Sewer Commission (BWSC) is undertaking a multi-year, multi-phase program to rehabilitate one of its most critical sewer interceptors. The New Boston Main Interceptor (NBMI) conveys sewage and stormwater from more than 3,000 tributary acres, including downtown Boston and multiple other district neighborhoods. The 102-in. reinforced concrete pipe is experiencing significant corrosion from hydrogen sulfide gas. This paper focuses on the unique complexities faced in large-diameter sewer rehabilitations within a dense urban fabric—including working within congested utility corridors and major commuter transportation corridors, minimizing neighborhood impacts, and anticipating the needs of many stakeholders. The goal of this project is to achieve a robust structural rehabilitation solution while minimizing hydraulic impacts to the network, construction impacts to the neighborhood, and local traffic. Trenchless techniques are optimal for urbanized settings, because they minimize excavation which, in this case, would be an average 30-ft deep excavation along a major residential/commercial street and would cause significant neighborhood disruption. In this instance, sliplining and geopolymer application were the preferred rehabilitation methods for this vital venture due to the significant corrosion, large interceptor size, bypassing design, and barriers to excavation. By early 2024, Phase 1 rehabilitation will be completed, Phase 2 rehabilitation will be under construction, and Phase 3 design will be 50% complete. BWSC employed complex bypass strategies for varying flow conditions, adapted lining practices to suit this unique project (e.g., slipline grouting into a tight annular space and field measuring ovality of spray liner), minimized excavation and utility conflicts through the use of existing access points and structures, and minimized traffic impacts with a narrow work zone. We will highlight these and other strategies that can prove beneficial to owners and engineers undertaking similar rehabilitation efforts in highly urbanized settings worldwide.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.027
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Confronting the Complexities of Large-Diameter Sewer Rehabilitation in a Highly Urbanized Setting

Irene McSweeney, Stefani Harrison
Underground infrastructure and sustainability
article

Confronting the Complexities of Large-Diameter Sewer Rehabilitation in a Highly Urbanized Setting

Irene McSweeney, Stefani Harrison
article en

Abstract

Urbanized areas around the globe face an increasingly urgent need to rehabilitate aging sewer infrastructure. Challenging projects in dense neighborhoods have long been deferred for their difficulty and are now rising to the top of the list of priorities. The Boston Water and Sewer Commission (BWSC) is undertaking a multi-year, multi-phase program to rehabilitate one of its most critical sewer interceptors. The New Boston Main Interceptor (NBMI) conveys sewage and stormwater from more than 3,000 tributary acres, including downtown Boston and multiple other district neighborhoods. The 102-in. reinforced concrete pipe is experiencing significant corrosion from hydrogen sulfide gas. This paper focuses on the unique complexities faced in large-diameter sewer rehabilitations within a dense urban fabric—including working within congested utility corridors and major commuter transportation corridors, minimizing neighborhood impacts, and anticipating the needs of many stakeholders. The goal of this project is to achieve a robust structural rehabilitation solution while minimizing hydraulic impacts to the network, construction impacts to the neighborhood, and local traffic. Trenchless techniques are optimal for urbanized settings, because they minimize excavation which, in this case, would be an average 30-ft deep excavation along a major residential/commercial street and would cause significant neighborhood disruption. In this instance, sliplining and geopolymer application were the preferred rehabilitation methods for this vital venture due to the significant corrosion, large interceptor size, bypassing design, and barriers to excavation. By early 2024, Phase 1 rehabilitation will be completed, Phase 2 rehabilitation will be under construction, and Phase 3 design will be 50% complete. BWSC employed complex bypass strategies for varying flow conditions, adapted lining practices to suit this unique project (e.g., slipline grouting into a tight annular space and field measuring ovality of spray liner), minimized excavation and utility conflicts through the use of existing access points and structures, and minimized traffic impacts with a narrow work zone. We will highlight these and other strategies that can prove beneficial to owners and engineers undertaking similar rehabilitation efforts in highly urbanized settings worldwide.

Boston Public Health Commission (US), NOAA National Weather Service (US), Water Research Commission (ZA)
Sustainable cities and communities
Openalex Percentile: Top 85%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics