Raise Bore Case Study: Application of Raise Bore Installation for Pipeline Construction on Steep Slopes

The construction of the Coastal GasLink (“CGL”) Pipeline encountered a multitude of steep slopes, primarily in the high-altitude sections within the Coastal Mountains near Kitimat, BC. Steep slope pipeline construction offers unique design, safety, and constructability challenges. Varying installation methodologies were utilized by CGL, including the application of a mining technique referred to as a Raise Bore. A Raise Bore is a trenchless installation method consisting of a near-vertical bored section and a horizontal blasted drift tunnel where the pipeline can be installed. This technology has been used extensively in the mining industry and TC Energy utilized this method to install a section of pipe on a previous project in Mexico. The use of a Raise Bore on CGL was the first of its kind for pipeline construction in Canada. This paper discusses the benefits and challenges associated with the implementation of a Raise Bore, as well as the design inputs, execution, risk analysis, and lessons learned from the CGL Project.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485590.020
Primary Topic
Engineering and Material Science Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Raise Bore Case Study: Application of Raise Bore Installation for Pipeline Construction on Steep Slopes

Colby A. Smith, Arend Deelen, Riley Bartel
Engineering and Material Science Research
article

Raise Bore Case Study: Application of Raise Bore Installation for Pipeline Construction on Steep Slopes

Colby A. Smith, Arend Deelen, Riley Bartel
article en

Abstract

The construction of the Coastal GasLink (“CGL”) Pipeline encountered a multitude of steep slopes, primarily in the high-altitude sections within the Coastal Mountains near Kitimat, BC. Steep slope pipeline construction offers unique design, safety, and constructability challenges. Varying installation methodologies were utilized by CGL, including the application of a mining technique referred to as a Raise Bore. A Raise Bore is a trenchless installation method consisting of a near-vertical bored section and a horizontal blasted drift tunnel where the pipeline can be installed. This technology has been used extensively in the mining industry and TC Energy utilized this method to install a section of pipe on a previous project in Mexico. The use of a Raise Bore on CGL was the first of its kind for pipeline construction in Canada. This paper discusses the benefits and challenges associated with the implementation of a Raise Bore, as well as the design inputs, execution, risk analysis, and lessons learned from the CGL Project.

Line Corporation (Japan) (JP)
Openalex Percentile: Top 78%
Engineering and Material Science Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.