Failing Our Way to Success

The Navajo-Gallup Water Supply Project (NGWSP) is a major infrastructure endeavor that will convey a reliable municipal and industrial water supply for future generations on Navajo Nation land and the Four Corners Region. The project will service northwest New Mexico, including the eastern section of the Navajo Nation, the southwestern portion of the Jicarilla Apache Nation, and the city of Gallup via approximately 300 mi of pipeline, 19 pumping plants, and 2 water treatment plants. The NGWSP has a congressionally mandated deadline for completion by December 31, 2029. There are currently 15 crossings along the NGWSP that have been analyzed for the most effective method of crossing and found that a trenchless installation is more beneficial than open-cut excavation at those locations. Throughout the preliminary-design, design phase, and construction phases of NGWSP, there have been many challenges with Horizontal Directional Drills (HDD) that have resulted in lessons during construction that have changed the way the Bureau of Reclamation (Reclamation) handles HDDs.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.048
Primary Topic
Education Systems and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Failing Our Way to Success

Hilda Castillo Smith, Kylie Pelzer, Hubert Quintana
Education Systems and Policy
article

Failing Our Way to Success

Hilda Castillo Smith, Kylie Pelzer, Hubert Quintana
article en

Abstract

The Navajo-Gallup Water Supply Project (NGWSP) is a major infrastructure endeavor that will convey a reliable municipal and industrial water supply for future generations on Navajo Nation land and the Four Corners Region. The project will service northwest New Mexico, including the eastern section of the Navajo Nation, the southwestern portion of the Jicarilla Apache Nation, and the city of Gallup via approximately 300 mi of pipeline, 19 pumping plants, and 2 water treatment plants. The NGWSP has a congressionally mandated deadline for completion by December 31, 2029. There are currently 15 crossings along the NGWSP that have been analyzed for the most effective method of crossing and found that a trenchless installation is more beneficial than open-cut excavation at those locations. Throughout the preliminary-design, design phase, and construction phases of NGWSP, there have been many challenges with Horizontal Directional Drills (HDD) that have resulted in lessons during construction that have changed the way the Bureau of Reclamation (Reclamation) handles HDDs.

United States Bureau of Reclamation (US)
Openalex Percentile: Top 80%
Education Systems and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.