Southern Nevada Water Authority Stage II Reliability Upgrades Project: Providing Reliability to Central Las Vegas Water Supply through a New Interconnect Pipeline

The Southern Nevada Water Authority (SNWA) has initiated the Stage II Reliability Upgrades (S2RU) Project in response to the increasing risk posed by aging yet critical conveyance infrastructure which supplies a significant portion of water to central Las Vegas. The Project aims to fortify the water supply system by introducing redundancy and reliability through the construction of the new Monthill Pumping Station (Monthill PS) and an accompanying 66-in. diameter interconnect pipeline. This pipeline will augment existing pumping station (PS) capacity by providing a dependable redundant route for supply of treated water, both when the existing pumping is in operation, and as replacement capacity during scheduled maintenance periods. The Monthill PS will deliver up to 90 million gallons per day (MGD) through this new pipeline and will not only alleviate the pressure on existing pumping facilities, but also enhance system efficiency and reliability by establishing a two-way flow between existing transmission laterals. The S2RU Project is not without challenges. This paper addresses the significant obstacles and unique design solutions associated with the design of the Monthill PS and interconnecting pipeline, including such challenges as a tight urban residential pipeline corridor alignment, coordination with existing utilities, a trenchless roadway crossing, and shallow groundwater. Through these design solutions that will be utilized to produce construction documents along with teamwork between SNWA and the design engineer, this project will ensure a reliable and robust water supply for the vibrant heart of Las Vegas.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.045
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Southern Nevada Water Authority Stage II Reliability Upgrades Project: Providing Reliability to Central Las Vegas Water Supply through a New Interconnect Pipeline

Joe Ortiz, Ryan Pearson, Gordon Thelin, Jonathan Tull
Geotechnical Engineering and Underground Structures
article

Southern Nevada Water Authority Stage II Reliability Upgrades Project: Providing Reliability to Central Las Vegas Water Supply through a New Interconnect Pipeline

Joe Ortiz, Ryan Pearson, Gordon Thelin, Jonathan Tull
article en

Abstract

The Southern Nevada Water Authority (SNWA) has initiated the Stage II Reliability Upgrades (S2RU) Project in response to the increasing risk posed by aging yet critical conveyance infrastructure which supplies a significant portion of water to central Las Vegas. The Project aims to fortify the water supply system by introducing redundancy and reliability through the construction of the new Monthill Pumping Station (Monthill PS) and an accompanying 66-in. diameter interconnect pipeline. This pipeline will augment existing pumping station (PS) capacity by providing a dependable redundant route for supply of treated water, both when the existing pumping is in operation, and as replacement capacity during scheduled maintenance periods. The Monthill PS will deliver up to 90 million gallons per day (MGD) through this new pipeline and will not only alleviate the pressure on existing pumping facilities, but also enhance system efficiency and reliability by establishing a two-way flow between existing transmission laterals. The S2RU Project is not without challenges. This paper addresses the significant obstacles and unique design solutions associated with the design of the Monthill PS and interconnecting pipeline, including such challenges as a tight urban residential pipeline corridor alignment, coordination with existing utilities, a trenchless roadway crossing, and shallow groundwater. Through these design solutions that will be utilized to produce construction documents along with teamwork between SNWA and the design engineer, this project will ensure a reliable and robust water supply for the vibrant heart of Las Vegas.

Southern Nevada Water Authority (US), Stantec (United States) (US), Stantec (Canada) (CA)
Clean water and sanitation
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Southern Nevada Water Authority Stage II Reliability Upgrades Project: Providing Reliability to Central Las Vegas Water Supply through a New Interconnect Pipeline — Joe Ortiz, Ryan Pearson, et al. · (2024) | TGRS Research Map | TGRS