The Pipeline Less Traveled By: Resolving Design Challenges along a Trail through Critical Wetland Areas

The City of Boulder, Colorado, is installing a new 2.5-mi sanitary sewer transmission main to convey the majority of the city’s wastewater flows to the Boulder Water Resource Recovery Facility. The final mile of the 42-in. and 54-in. diameter interceptor runs through Sawhill Ponds, owned by the State of Colorado, and Walden Ponds, owned by Boulder County, before connecting into the headworks of the wastewater treatment facility. These critical habitat areas and wetlands are beloved and include a trail network that is well used by the surrounding public. To design the pipeline through this unique area, the project team coordinated closely with the city, county, and state to identify critical habitat and to carefully coordinate the alignment to navigate existing wetlands, trees, and structures. Addressing these challenges also required a redesign of a dam spillway separating two of the ponds that the new 54-in. interceptor crosses between, as well as designing for a crossing of a FEMA-certified levee into the treatment facility. Furthermore, due to the shallow grade (3.8′ to top of the 54-in. pipe), the project team had to work closely with manhole and pipeline suppliers to design custom shallow manhole structures that are traffic rated, allow for safe operation, and align with the desires for the use of the future trail system. This case study reviews how the project team weighed multiple approaches to mitigate the unique design challenges for this project. By communicating closely with stakeholders, suppliers, and permitting agencies, the project team successfully selected an alignment and prepared a design that not only resolved the unique site’s challenges, but also improved the Sawhill Ponds and Walden Ponds wetland areas. The presentation includes an assessment of the overall constructability through this area as well as the unique design details that were prepared.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.044
Primary Topic
American Environmental and Regional History
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Pipeline Less Traveled By: Resolving Design Challenges along a Trail through Critical Wetland Areas

Michael D. Gossett, Peter Brask, Chris Olson
American Environmental and Regional History
article

The Pipeline Less Traveled By: Resolving Design Challenges along a Trail through Critical Wetland Areas

Michael D. Gossett, Peter Brask, Chris Olson
article en

Abstract

The City of Boulder, Colorado, is installing a new 2.5-mi sanitary sewer transmission main to convey the majority of the city’s wastewater flows to the Boulder Water Resource Recovery Facility. The final mile of the 42-in. and 54-in. diameter interceptor runs through Sawhill Ponds, owned by the State of Colorado, and Walden Ponds, owned by Boulder County, before connecting into the headworks of the wastewater treatment facility. These critical habitat areas and wetlands are beloved and include a trail network that is well used by the surrounding public. To design the pipeline through this unique area, the project team coordinated closely with the city, county, and state to identify critical habitat and to carefully coordinate the alignment to navigate existing wetlands, trees, and structures. Addressing these challenges also required a redesign of a dam spillway separating two of the ponds that the new 54-in. interceptor crosses between, as well as designing for a crossing of a FEMA-certified levee into the treatment facility. Furthermore, due to the shallow grade (3.8′ to top of the 54-in. pipe), the project team had to work closely with manhole and pipeline suppliers to design custom shallow manhole structures that are traffic rated, allow for safe operation, and align with the desires for the use of the future trail system. This case study reviews how the project team weighed multiple approaches to mitigate the unique design challenges for this project. By communicating closely with stakeholders, suppliers, and permitting agencies, the project team successfully selected an alignment and prepared a design that not only resolved the unique site’s challenges, but also improved the Sawhill Ponds and Walden Ponds wetland areas. The presentation includes an assessment of the overall constructability through this area as well as the unique design details that were prepared.

Hendrix College (US)
Openalex Percentile: Top 80%
American Environmental and Regional History
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.