Deposit Analysis of Pipelines with Hydraulic Grade Lines Measured by Free-Floating, In-Line Tools

This paper demonstrates the methodology for calculating the hydraulic grade line from free-floating, in-line inspection tools and the subsequent deposit analysis of the hydraulic grade line. Neutrally buoyant, in-line inspection tools measure the pressure along the entire pipeline length under regular operating conditions. Deploying multiple tools with a short time delay allows for localized features to be distinguished from changes to the pipeline operation during the deployment. Identified operational changes during the deployment are corrected before calculating the hydraulic grade line using an elevation profile of the pipeline. The resulting hydraulic grade line represents the pressure-head loss due to friction along the pipeline; locations with steeper pressure-head loss indicate restrictions in the pipeline from the build-up of deposits. The gradient of the hydraulic grade line, pipeline specifications, and inspection flow rate are used with the Hazen–Williams equation to calculate the levels of deposits in several segments along the pipeline.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485583.032
Primary Topic
Non-Destructive Testing Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Deposit Analysis of Pipelines with Hydraulic Grade Lines Measured by Free-Floating, In-Line Tools

Anouk van Pol, John van Pol, Matthew Kindree
Non-Destructive Testing Techniques
article

Deposit Analysis of Pipelines with Hydraulic Grade Lines Measured by Free-Floating, In-Line Tools

Anouk van Pol, John van Pol, Matthew Kindree
article en

Abstract

This paper demonstrates the methodology for calculating the hydraulic grade line from free-floating, in-line inspection tools and the subsequent deposit analysis of the hydraulic grade line. Neutrally buoyant, in-line inspection tools measure the pressure along the entire pipeline length under regular operating conditions. Deploying multiple tools with a short time delay allows for localized features to be distinguished from changes to the pipeline operation during the deployment. Identified operational changes during the deployment are corrected before calculating the hydraulic grade line using an elevation profile of the pipeline. The resulting hydraulic grade line represents the pressure-head loss due to friction along the pipeline; locations with steeper pressure-head loss indicate restrictions in the pipeline from the build-up of deposits. The gradient of the hydraulic grade line, pipeline specifications, and inspection flow rate are used with the Hazen–Williams equation to calculate the levels of deposits in several segments along the pipeline.

Vol. 4
a.i. solutions (United States) (US)
Openalex Percentile: Top 86%
Non-Destructive Testing Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.